产品出厂后,负责从安装到用户调试验收,直到变电站正式投运的现场技术指导及处理现场问题。
Manufactured products, responsible to users from installation, commissioning acceptance until substation formal powerstation on-site technical guidance and treatment of the problem.
2007年2月1日,玻璃钢电缆护套管生产线正式投运。
February 1, 2007, FRP cable sheathing tube production line begins to operate.
仿真结果可为本课题中高层应用软件提供可靠的测试环境,在系统正式投运前还可以对在校学生或者调度员进行培训,帮助学员熟悉电网结构和安全运行方式。
Our work can provide the reliable environment for testing system, train dispatcher and students before running in real place and help student familiar with pool structure and operation way.
仿真结果可为本课题中高层应用软件提供可靠的测试环境,在系统正式投运前还可以对在校学生或者调度员进行培训,帮助学员熟悉电网结构和安全运行方式。
Our work can provide the reliable environment for testing system, train dispatcher and students before running in real place and help student familiar with pool structure and operation way.
应用推荐