铁塔结构形式新颖,杆塔导线横担悬臂较长。
The structure formation of towers is very novel, and the cross arm is rather long.
绝缘子可以保证导线和横担、杆塔有足够的绝缘。
Insulator can guarantee adequate insulation between the conductors and cross arms, towers.
特高压线路的铁塔重量大、铁塔高、横担长、结构复杂。
The tower of the extra high voltage (EHV) transmission line is heavy, tall, and it has longer cross arm and complex structure.
横担采用轻钢龙骨,吊杆采用全牙螺杆,选用规格见下表。
Supported by metal frame, boom using screw-wide teeth, use specifications shown in the table below.
管内有聚氨酯发泡剂,以增加横担的强度和防止雨水渗透;
It is of polyurethane foam inside , in order to increase the intensity of crossarm and the prevention of rainwater infiltration;
在力学试验中,采用了倒v型绝缘子串的横担侧挂点固定、导线侧加力的方法。
In the mechanic testing, the method of backward V insulators with the side fixing of cross-arm and adding force on side of wire was adopted.
本文设计了一种质量板在四个球面上滑动的FPS型MTMD减震系统,并安装在某输电塔的横担处。
Moreover, the structure and fasten of the device are convenient. A FPS-MTMD system was designed, in which a mass-plate slides on four spherical surfaces.
利用ANSYS软件分析了输电铁塔鸭嘴形横担上平面的两种布材形式分别对其整体稳定极限承载力的影响。
The influence of 2 X-crossing arrangements for the upper plane on the ultimate bearing capacity of duck bill cross arm in the transmission tower are analyzed by ANSYS in this paper.
利用ANSYS软件分析了输电铁塔鸭嘴形横担上平面的两种布材形式分别对其整体稳定极限承载力的影响。
The influence of 2 X-crossing arrangements for the upper plane on the ultimate bearing capacity of duck bill cross arm in the transmission tower are analyzed by ANSYS in this paper.
应用推荐