在研究作业车间模糊调度问题的基础上,建立了两种作业车间模糊调度模型。
Two kinds of model are formulated based on the studies of job shop fuzzy scheduling problem.
指出确定性环境下的最小化误工任务数单机调度问题是模糊情况的特例。
Also, the deterministic counterpart of this single machine scheduling problem is a special case of fuzzy version.
在电梯群调度上已提出了模糊控制法、神经网络法等多种应用到实际中去的方法。
Many methods such as Fuzzy Control Approach and Neural Network Approach are already used in elevator group dispatch.
针对电液伺服速度系统的非线性和参数时变特性,提出了模糊增益调度控制方法。
Considering the nonlinear and the parameters variability, which vary widely with the working condition in the electro-hydraulic servo velocity system, fuzzy gain scheduling controller was developed.
调度的目的是同时最大化模糊交货期和混合优先约束的最小满意程度。
The objective is to maximize the minimum satisfaction level of fuzzy due dates and mixed precedence constraints.
分析了一类带有模糊时间延迟和混合优先关系的单机调度问题。
A single machine-scheduling problem with fuzzy delays and mixed precedence relations is discussed.
同时为提高系统的预测性,改善调度性能,对模糊算法进行了优化,并推导了中心值、宽度的优化算法。
At the same time, to improve the prediction of the system and the dispatching, it optimizes the fuzzy algorithm and derives the optimized algorithm of center value and width.
第二类问题为具有预防性维修的模糊柔性作业车间调度问题。
The second problem is the fuzzy flexible job shop scheduling problem with preventive maintenance.
第一类问题为模糊柔性作业车间调度问题。
The first problem is the fuzzy flexible job shop scheduling problem.
该调度器采用模糊最大优先调度算法对网络消息发送的优先级进行动态调整。
A scheduling algorithm of the scheduler, namely fuzzy maximum first (FMF), can schedule dynamically the priority of network message.
水库防洪;分类预报调度方式;风险分析;洪水预报; 洪水分类;相应涨差模型;三角模糊数;天气系统;
Reservoir Flood Control; Classified Forecast Dispatching Mode; Risk Analysis; Flood Forecast; Flood Classification; Corresponding Rising Difference Model; Triangle Fuzzy Number; Weather Systems;
研究了一种具有模糊交货期的最小化全部满意度的单机调度问题。
The problem of sequencing jobs with fuzzy due-dates on a single machine to maximize the degree of satisfaction among all the jobs is considered.
将调度周期开始的水库蓄水量作为一个三角模糊量,以描述初始蓄水预测可能存在的误差。
Reservoir water volume at the initial hour was formulated as a triangular fuzzy number, representing forecasting errors of reservoir water level.
将传统的确定性车辆调度问题扩展为具有模糊特征的模糊车辆调度问题。
The traditional deterministic vehicle scheduling problem (VSP) was expanded into a VSP with fuzzy features. The cost coefficients of the VSP with the features were treated as fuzzy numbers.
实例应用证明,将模糊数学引入到梯级水库防洪调度决策中研究,体现了其优越性。
It is proved that fuzzy mathematics showed his superiority in the application of multiobjective flood operation of cascade reservoirs.
通过对模糊神经网络训练,建立干扰和半导体生产线状态等输入参数与优化的重调度策略输出之间的映射关系。
The relation between the input of FNN, such as disturbance, system state parameters, and output of FNN, optimal rescheduling strategy, is built by FNN.
讨论了一类模糊交货期和混合优先约束下的单机调度问题。模糊交货期表示对任务完成时间的满意程度;
A problem of scheduling jobs on a single machine subject to fuzzy due dates and mixed precedence constraints is discussed.
提出的可变模糊优选理论、模型与方法,不仅能用于水电站联合电力调度系统的方案优选,也可应用于其他系统的优选决策。
The theory, model and method can be applied to both joint operation scheme optimization of hydropower stations and decision-making of other systems.
对模糊多资源应急调度问题,建立了使时间约束满意度最大的模糊数学规划模型,给出了求解算法。
The fuzzy mathematical programming model of the scheduling decision in fuzzy multi-resource emergency is established, an algorithm of the greatest satisfaction degree for time restraint is proposed.
对模糊多资源应急调度问题,建立了使时间约束满意度最大的模糊数学规划模型,给出了求解算法。
The fuzzy mathematical programming model of the scheduling decision in fuzzy multi-resource emergency is established, an algorithm of the greatest satisfaction degree for time restraint is proposed.
应用推荐