• 研究作业车间模糊调度问题基础,建立了作业车间模糊调度模型

    Two kinds of model are formulated based on the studies of job shop fuzzy scheduling problem.

    youdao

  • 指出确定性环境下最小化误工任务数单机调度问题模糊情况特例

    Also, the deterministic counterpart of this single machine scheduling problem is a special case of fuzzy version.

    youdao

  • 电梯调度提出了模糊控制法、神经网络法多种应用到实际中去的方法

    Many methods such as Fuzzy Control Approach and Neural Network Approach are already used in elevator group dispatch.

    youdao

  • 针对电液伺服速度系统非线性参数时变特性,提出了模糊增益调度控制方法

    Considering the nonlinear and the parameters variability, which vary widely with the working condition in the electro-hydraulic servo velocity system, fuzzy gain scheduling controller was developed.

    youdao

  • 调度目的同时最大化模糊交货期混合优先约束最小满意程度

    The objective is to maximize the minimum satisfaction level of fuzzy due dates and mixed precedence constraints.

    youdao

  • 分析了一类带有模糊时间延迟混合优先关系单机调度问题

    A single machine-scheduling problem with fuzzy delays and mixed precedence relations is discussed.

    youdao

  • 同时提高系统预测性,改善调度性能,模糊算法进行了优化,推导中心值、宽度优化算法。

    At the same time, to improve the prediction of the system and the dispatching, it optimizes the fuzzy algorithm and derives the optimized algorithm of center value and width.

    youdao

  • 二类问题具有预防性维修模糊柔性作业车间调度问题。

    The second problem is the fuzzy flexible job shop scheduling problem with preventive maintenance.

    youdao

  • 一类问题模糊柔性作业车间调度问题。

    The first problem is the fuzzy flexible job shop scheduling problem.

    youdao

  • 调度采用模糊最大优先调度算法网络消息发送的优先级进行动态调整。

    A scheduling algorithm of the scheduler, namely fuzzy maximum first (FMF), can schedule dynamically the priority of network message.

    youdao

  • 水库防洪分类预报调度方式风险分析洪水预报; 洪水分类相应模型三角模糊天气系统

    Reservoir Flood Control; Classified Forecast Dispatching Mode; Risk Analysis; Flood Forecast; Flood Classification; Corresponding Rising Difference Model; Triangle Fuzzy Number; Weather Systems;

    youdao

  • 研究一种具有模糊交货期最小化全部满意度单机调度问题

    The problem of sequencing jobs with fuzzy due-dates on a single machine to maximize the degree of satisfaction among all the jobs is considered.

    youdao

  • 调度周期开始水库蓄水量作为一个三角模糊描述初始蓄水预测可能存在误差

    Reservoir water volume at the initial hour was formulated as a triangular fuzzy number, representing forecasting errors of reservoir water level.

    youdao

  • 传统确定性车辆调度问题扩展具有模糊特征模糊车辆调度问题。

    The traditional deterministic vehicle scheduling problem (VSP) was expanded into a VSP with fuzzy features. The cost coefficients of the VSP with the features were treated as fuzzy numbers.

    youdao

  • 实例应用证明模糊数学引入到梯级水库防洪调度决策研究,体现了其优越性

    It is proved that fuzzy mathematics showed his superiority in the application of multiobjective flood operation of cascade reservoirs.

    youdao

  • 通过模糊神经网络训练,建立干扰和半导体生产线状态输入参数优化调度策略输出之间的映射关系

    The relation between the input of FNN, such as disturbance, system state parameters, and output of FNN, optimal rescheduling strategy, is built by FNN.

    youdao

  • 讨论了一类模糊交货期混合优先约束单机调度问题模糊交货期表示任务完成时间的满意程度;

    A problem of scheduling jobs on a single machine subject to fuzzy due dates and mixed precedence constraints is discussed.

    youdao

  • 提出可变模糊优选理论模型方法,不仅用于水电站联合电力调度系统方案优选,也可应用于其他系统的优选决策

    The theory, model and method can be applied to both joint operation scheme optimization of hydropower stations and decision-making of other systems.

    youdao

  • 模糊多资源应急调度问题,建立了使时间约束满意度最大模糊数学规划模型给出求解算法

    The fuzzy mathematical programming model of the scheduling decision in fuzzy multi-resource emergency is established, an algorithm of the greatest satisfaction degree for time restraint is proposed.

    youdao

  • 模糊多资源应急调度问题,建立了使时间约束满意度最大模糊数学规划模型给出求解算法

    The fuzzy mathematical programming model of the scheduling decision in fuzzy multi-resource emergency is established, an algorithm of the greatest satisfaction degree for time restraint is proposed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定