• 沉管灌注其成效率承载力强工程成本低、桩长控制灵活优点得到广泛地应用。

    Driven cast-in-place pile is widely used because it has many advantages such as high efficiency of accomplishing pile, high carrying capacity, lower project cost, controlling pile-length agility.

    youdao

  • 结构能够承受最大弯矩吊点不为负值作为限制条件,得出安全作业跨距和倾角参数控制曲线

    With the limitations of the maximal bearable bending moment and the positive lifting force, the controlling parameter curves of span and lifting Angle are then acquired to guide the safety operation.

    youdao

  • 结果表明组合基础不仅可以大量减少用量,而且有效控制基础整体沉降差异沉降,显示了其良好的应用前景。

    The results show that long-short piles foundation demands fewer long piles and can control the average settlement and differential settlement effectively.

    youdao

  • 采用线弹塑性荷载传递函数极限承载力控制法确定水泥搅拌有效

    According to the ultimate bearing capacity control method, the effective length of a cement-mixed pile is calculated with the linear elastic-plastic load transfer function.

    youdao

  • 采用以变形控制确定水泥搅拌优化设计方法

    A new optimum design method of cement mixing pile length is to control the...

    youdao

  • 提出用方法控制混凝土解决施工中存在桩长问题。

    The method of changing the pile length to control the correct position rate was raised in the paper. This method can solve the problem of pile length in the construction.

    youdao

  • 选择了合适持力层沉降量控制

    The length of long pile is determined by total settlement after specific bearing layer is chosen.

    youdao

  • 控制路堤沉降主要因素,其次是间距板尺寸

    Pile length is the main factor that effects the settlement of embankment; pile space and dimension of pile cap are followed.

    youdao

  • 控制路堤沉降主要因素,其次是间距板尺寸

    Pile length is the main factor that effects the settlement of embankment; pile space and dimension of pile cap are followed.

    youdao