• 检查砌砖质量标定中心线用的测量标桩已经,测量仪器准备完毕,校验合格

    Survey pegs for checking brickwork quality and demarcating centerlines have been finished and surveying instruments have been prepared and well checked.

    youdao

  • 后续扫描中,如果计算校验等于此前计算的校验和,则页面正在更改,因此不是一个合格合并候选对象。

    On a subsequent scan, if a newly computed checksum is different from the previously generated checksum, the page is changing and is therefore not a good candidate for merging.

    youdao

  • 每次开机后测试标准孔,然后测试不合格蒸发器样品应为合格,测试合格样品应为合格(蒸发。器样品每月更换新的。)即校验仪器工作正常后,才能测试蒸发器。

    Notice: Once begin the operation, standard leakage devices must be tested, then check the failed evaporator samples as "Fail" and passed evaporator samples as "Pass".

    youdao

  • 分析仪器合格验证性能校验过程方法进行综述同时购买仪器提出参考意见。

    This paper is about analytical instrument qualification and performance verification, including purpose, process and method; It gives some suggestion on buying instruments.

    youdao

  • 分析仪器合格验证性能校验过程方法进行综述同时购买仪器提出参考意见。

    This paper is about analytical instrument qualification and performance verification, including purpose, process and method; It gives some suggestion on buying instruments.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定