钢结构节点设计中,梁与柱弱轴方向的柔性连接常采用剪力板高强螺栓连接,螺栓群所承受的荷载有竖向力和偏心力矩。
In the connection design of steel structure, the shear plate with high-strength bolt connection is extensively used at the flexible joint where the beam is connected to the weak axis of the column.
钢-混凝土组合梁是指钢梁和混凝土板通过剪力连接件连接形成整体共同工作的受弯构件。
Steel-concrete composite beam is a kind of flexural member composed by concrete slab and steel beam via shear connectors.
某钢厂列吊车梁在工作中,由于吊车工作的动态作用,导致制动梁(连接板)经常发生断裂,固定连接板的螺栓松动。
The brake beam(connecting plate) is often broken, and the bolts for fixing the connecting plate are loosed due to the crane′s dynamic load when D series of crane beams are working in a steel plant.
使用预制钢筋混凝土梁或者现浇钢筋混凝土板会很容易将两侧地下连续墙的跨度空间连接起来,从而完成隧道的主壳。
The span between two such diaphragm walls can easily be bridged with precast reinforced concrete beams or a cast in-site reinforced concrete slab to complete the main shell of the tunnel.
钢管混凝土结构目前在高层结构中的应用越来越广,但是钢管混凝土柱与梁板的连接还存在着诸多问题,特别是钢管混凝土柱与梁连接的节点受力性能还需进一步研究。
At present, the concrete filled steel-tubular structure has been used in many hight - building, but the CFST column connected beam have a lot of questions, need to study deeply.
在此基础上,讨论分析了焊接缺陷、连接形式、肘板形状以及折边等因素对梁肘板疲劳性能的影响。
The effects of flaw, connection, flange and form of knee on fatigue strength of beam brackets are discussed.
另外两个节点分别考虑了连接在梁翼缘的水平加劲板的作用和连接上下两个翼缘的垂直三角板的作用。
Another detail considers the addition of horizontal reinforcing plates (cover plates) to the beam flanges; a third adds vertical triangular (fin) plates to both beam flanges.
另外两个节点分别考虑了连接在梁翼缘的水平加劲板的作用和连接上下两个翼缘的垂直三角板的作用。
Another detail considers the addition of horizontal reinforcing plates (cover plates) to the beam flanges; a third adds vertical triangular (fin) plates to both beam flanges.