更改目标平台的操作步骤如下。
它会迫使您更改目标对象的公用接口。
It may force you to change the public interface to the target object.
如何:更改目标数据库版本。
更改目标XML文档中任何文本或属性节点的值。
Changing the value of any text or attribute nodes in the target XML document.
主管经常任意更改目标(会说明理由)。
The manager changes the goals frequently without any reasons.
必须要有一个或者多大能够被认为是更改目标的可识别业务。
There must be one or more tangible business values identified as the goal of any change.
不要更改目标文件的名称,只修改文件的路径即可。
Do not change the names of the target files, just the path to the files.
创建或删除关系的过程不会以任何方式实际更改目标部分或资源。
The process of creating or deleting the relationship does not physically alter the target part or resource in any way.
这是因为在更改目标表的同一工作单元期间,QApply也会写入控制表中。
This is because Q Apply writes to these tables during the same unit of work as the changes to target tables.
请指定结果数据库的位置。如需更改目标数据库类型,请选择“浏览”。
Specify the location for the resulting database. To change the target database type, choose Browse.
如果结果表明风险概率很高,您可能希望更改目标和需求,以将风险缓解到更加可接受的级别。
If the results show high probability of risks, you might want to change goals and requirements to mitigate the risks to more acceptable levels.
首先,确定需要更改目标文档的哪个部分,然后确定将用于填充目标文档的数据来自什么地方。
First determine what part of the target document needs to be changed and then determine where the data that will populate the target document is going to come from.
因为操作和它所作用的对象是单独实现的,所以可以在不更改目标对象的前提下更改操作。
Since the operation is implemented separately from the objects on which it works, the operation can be changed without changing the target objects.
您不必重新编写应用程序,只需更改目标环境并按照步骤进行操作,即可将应用程序发布到Azure。
You don’t need to rewrite your application; simply change the target environment, follow the steps and then your application is published to Azure.
更改目标服务端口地址并生成stub之后,您将看到它们之间的stub的差别,如清单5和清单6所示。
After you change the location of target service port address and then generate the stub classes, you will see the stub differences between them, as shown in Listing 5 and Listing 6.
这种方法的另外一项受益就是您能够更改链接的操作方式、更改目标链接,而不必修改所有jsp页面。
Another benefit of this approach is that you can change how your links operate, and change destination links, without having to modify all of your JSP pages.
此功能意味着您可以方便地执行管理任务,例如,在将服务提供程序从一个环境移动到另一个环境时更改目标地址。
This feature means that you can easily perform administrative duties, such as changing target addresses when moving service providers from one environment to another.
我不确定是否可以更改目标平台或SDK的路径与方法,和我宁愿试图找出为什么SDK不工作和如何修复它。
I'm not sure if you can change the target platform or the SDK paths with that approach though, and I'd rather try to find out why the SDK doesn't work and how to fix it instead.
如果正在调试一个64位应用程序并想使用“编辑并继续”,则必须更改目标平台并将该应用程序编译为32位应用程序。
If you are debugging a 64-bit application and want to use Edit and Continue, you must change the target platform and compile the application as a 32-bit application.
对对象定义进行很小的更改即可实现这些目标。
A small change to the object definitions will accomplish these goals.
应用协议以后,对源模型的任何更改都会扩大到目标模型中。
With this protocol applied, any changes to the source model are propagated to the target model.
在存储库及其流程目标之间更改集合流程。
Change sets flow between a repository workspace and its flow targets.
通过使用作为数据更改操作的目标的查询,可以删除或更新由复杂的SQL(包括ORDERBY)确定的行。
Using queries as the target of a data change operation allows deletion or updates of rows determined by complex SQL including ORDER by.
例如,您可以添加或更改调用目标,或者更新调用选择规则。
For example, you can add or change the invocation target, or update the invocation selection criteria.
在整合过程的刷新周期之间,数据源中数据的更改越频繁,目标中的数据就会变得越陈旧。
The more frequently data in the sources changes between the refresh cycles of the consolidation process, the more stale the data becomes in the target.
这包括用于捕捉更改、使用MQ将更改传输到目标系统和在目标系统上应用更改的时间。
This includes the time it takes to capture the change, transport it to the target system using MQ, and apply the change at the target.
在您再次标记更改之后,转换就会将源代码更改合并到目标uml模型中。
After you mark the changes again, the transformation merges the source code changes into the target UML model.
您也可以在运行时更改缺省目标。
它要求中央银行需随着价格偏离预期轨道而反复更改未来通胀目标。
It would require a central bank repeatedly to alter its goal for future inflation as prices deviated from the desired path.
当第一或第二软目标更改时,可用性变量的类型将更改。
When the first and second soft goals change, the types of availability variables change.
应用推荐