您应用程序的任何计算是基于日期或者甚至是每天的时间吗?
Are any computations in your application based on the date or even time of day?
他们的内部时钟从那时开始运转,使得他们能够在之后计算日期和时间。
Their internal clocks start counting from then, so they can calculate the date and time in the future.
它拥有丰富的内嵌功能库,用于提高您的通常所需的操作的生产力,例如日期和时间计算、字符串处理,等等。
It has a rich library of built-in functions to boost your productivity for commonly required operations, such as date and time math, string manipulation, and so forth.
系统通常只意识到当前的日期和时间,所以让计算机从当前日期中提取出出生日期来获得年龄值是一件微不足道的事。
The system is always aware of the current date and time, so it's a trivial thing for the computer to subtract a birth date from the current date to get an age value.
许多日期和时间计算都可以在不涉及时区的情况下完成,但是仍然需要了解DateTimeZone如何影响Joda 的操作。
Many date and time calculations can be done without regard to time zone, but it's still important to understand how DateTimeZone affects what Joda is doing.
例如,年龄是一个随时间而不断改变的值,可以通过一个特定的日期加以计算,即出生日期或创建日期。
For example, an age is a value that changes over time and can be calculated from a specific date — the birth or creation date.
这里采用了最常用的标准日期格式:ISO日期(包括年),仅仅是一天的某个时间或以分钟计算的时间偏移。
This takes the most common standard date formats: ISO dates (including year), just a time of day, or an offset in minutes.
DatesandTimes提供了大量的日期操作功能,包括计算两个日期之间的差,以及检索本地系统的当前日期和时间。
Dates and Times provides a broad spectrum of date manipulation functionality, including calculating the difference between two dates and retrieving the local system current date and time.
日志会给你的IP地址,该得罪的计算机,所采用的方法,以及时间和日期,它是表现。
The logs will give you the IP address of the offending computer, the method used, and the time and date it was performed.
在如此的情况,计算保存机密的义务的时期的时间的点将是检验的日期。
In such case, the point of time for calculating the period of obligation of keeping confidentiality shall be the date of inspection.
然而,通过工艺路线中设置的加工时间计算出来的生产开始日期位于通过在物料主数据中设置的产内加工计算出来的工单开始日期之前。
However, the production start date calculated using the routing lies before the order start date calculated using the in-house processing time in the material master record.
描述如何执行常见的日历和时钟任务,如操作和比较日期,以及计算经过的时间。
Describes how to perform common calendar and clock tasks, such as manipulating and comparing dates and calculating elapsed time.
以去年(按日期)完成任务的执行,并计算当时和现在之间的时间间隔。
Take the last (by date) completed execution of a task and calculate the time interval between then and now.
我甚至有一个代码,计算日期和时间是否在过去或将来,为了显示“即将到来”的标签,在这些活动中,还没有过去。
I even have a code that calculates whether the date and time is in the past or the future in order to display an "UPCOMING" tag on those events that are not yet past.
返回计算机系统内部时钟的当前日期与时间。有关详细内容,请看“帮助”!
Returns the serial number of the current date or time. See Help for information about serial Numbers!
每堂课必须签到。签到时间和日期会有计算机系统自动计算。
You must sign your presence to each of the courses you attend. The date and the time of the course will be detected automatically.
同样还会计算比较基准计划完成日期和目前规划完成日期之间的差异,并显示在“完成时间差异”域中。
The variance is also calculated between the baseline finish dates and scheduled finish dates, shown in the Finish Variance field.
因为有你的开始日期和你总是可以动态计算到期日的时间间隔。
Since you have the start dates and the intervals you can always dynamically compute the due date.
因为大多数移动平均线代表所有计算日期的平均值,值得注意的是时间周期不总是使用天。
Most moving averages take the closing prices of a given asset and factor them into the calculation.
当计算“已完成”贷款所需时间时,我们再次使用上市开始日期和贷款发放日期来确定发放贷款所需的平均天数。
When calculating days to "Complete", we again use the listing start date and loan origination date to determine the average number of days it takes for a loan to originate.
如果您的计算机日期由一笔巨额,是不正确的曲奇饼对时间敏感,并且可能不工作。
Cookies are time sensitive and may not work if your computer date is incorrect by a large amount.
下面的示例枚举在本地计算机上找到的时区,并显示所有浮动日期转换的转换时间信息。
The following example enumerates the time zones found on the local computer and displays transition time information for all floating-date transitions.
计算此时区中的时间与协调世界时(utc)之间针对特定日期和时间的偏移量或差值。
Calculates the offset or difference between the time in this time zone and Coordinated Universal time (UTC) for a particular date and time.
包含的成员会取得目前日期或时间、执行日期计算、传回日期或时间、设定日期或时间,或计算处理序持续期间的时间。
Contains members that get the current date or time, perform date calculations, return a date or time, set the date or time, or time the duration of a process.
那么问题的发生可能由于你计算机上的时间和日期设置出错了。
If this extended error code is 80048412 the problem often occurs because the time and date settings on the computer are incorrect.
详情及功能包括:- 行事历 :按宝宝出生日期自动计算其疫苗注射时间表,用户亦可输入行程并设置自动提醒功能。
Components and functions include: - Calendar: Calculate and import the immunization schedule by the baby's date of birth. User can create events in the calendar. Alert function is also available.
通过工艺路线中设置的加工时间计算出来的生产完成时间位于通过物料主数据中维护的产内加工时间计算出来的工单完成日期之后,这条例外信息就会产生。
64:The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
我需要改动计算日期时间的关于日期的计算法。
I need to change the date rule so that it will evaluate what DateTime.
我需要改动计算日期时间的关于日期的计算法。
I need to change the date rule so that it will evaluate what DateTime.
应用推荐