着重论述了本条款在公路投标、施工组织、工程进度、工程质量、工程费用、合同管理各个阶段中的应用。
In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.
工程管理贯穿于工程施工到竣工的各个阶段,在工程施工的全过程中,进行计划、组织、指挥、协调和控制。
Project management through the engineering construction to the stages of completion, in the whole process of engineering construction, planning, organizing, directing, coordination and control.
系统地介绍了施工阶段影响公路工程造价的各种因素,阐明了工程造价管理与控制的方法及措施。
It systematically presents the influencing factors of the engineering cost during the stage of construction, and illuminates the management and control methods of the engineering cost.
指出公路项目质量管理必须从以下四个阶段抓起即项目决策阶段、设计阶段、施工阶段、交工竣工验收阶段。
The quality management Muse be take from four side as follow; project decision making stage, design stage, construct stage and finish check and accept stage in our province.
长输管道;风险管理;施工阶段;模糊综合评价。
Long Pipeline; Risk Management; Construction Phase; Fuzzy Aggregative Risk Assessment.
项目经理部将成立专门的劳动力档案管理系统,制定各施工阶段劳动力的需求计划。
The project management department shall establish a special labor archives management system and work out the required labor plan at different construction stages.
其次,在规划施工阶段的开发商及业主推行绿色管理。
Secondly, in the planning of the construction phase to the developers and owners to implement green management.
第三,施工阶段是整个工程造价管理的根本,需要精打细算。
Third, construction stage is the essential for project cost management, needed to plan carefully.
本文提出了与设计、施工、管理阶段其他手段和措施一体化的“工作分享法”;
The integration into a 'job-sharing approach' with other instruments and measures of the design, construction and management phase are proposed.
本文着重探讨了建设项目实施阶段的招投标管理、施工管理和结算管理等几个项目建设全过程监控的重点问题。
This paper discussed about some key problems in the whole-process control in the implementation phase of construction project: tender management, construction management and final account management.
因此,应加强施工阶段的质量管理。
Therefore, quality management should be strengthened at the phase of construction.
文章分析了园林绿化过程中施工管理存在的问题,从园林绿化工程施工前、中、后三个阶段提出了质量控制的措施。
This paper analyzes the process of landscape construction management problems, from landscape project construction before, in and after three stages puts forward the measures of quality control.
工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
从技改项目发包方的角度,提出了建设项目设计、招投标、施工和后期等阶段的管理控制要点。
The paper proposes the management control points in the stages of designing, bidding, construction and completion, from the perspective of technical renovation project owner.
本文旨在提出一种住宅开发施工阶段项目管理的模式。
This paper aims at finding a project management model of the housing construction period.
结合北京市地铁隧道盾构法施工的现状,对施工阶段的划分及各阶段的质量管理与控制要点进行阐述。
Considering the present situation of shield tunneling on Beijing metro, the paper describes the construction stage division and the main points of engineering quality control for shield tunneling.
摘要:在施工项目管理的全过程中,为了取得各阶段目标和最终目标的实现,在进行各项活动中,必须加强管理工作。
Abstract: in the construction project management in the whole process, in order to obtain the phase object and realize the final goal, in various activities, we must strengthen the management work.
制订合理的隧道施工排水方案,是进行费用分析的基础,并在施工阶段的工程造价管理中有着重要的作用。
It will form the basis of cost analysis to institute reasonable drainage scheme in tunnel construction, which also plays an important role in the engineering cost control of construction stage.
施工合同履约阶段是合同管理的重要阶段,从我国施工企业目前合同管理的现状出发,对提高我国施工企业总承包合同管理水平进行了探讨。
To research how to make construction enterprises to get rid of present dilemma by improving the level of general contracting management and hence advancing their competence, is the topic of the paper.
本文结合施工阶段的管理对策,系统论述施工现场的管理策略方法。
According to the construction stage management countermeasure system is discussed, the construction site management strategy.
提出了在规划设计、工程施工和营运管理阶段相应的对策和建设性的建议。
Some constructive suggestions are put forward in relative processes and stages of planning, design, construction and operation.
而项目管理程序和作业文件主要从项目立项决策阶段、设计阶段、施工阶段、采购阶段、竣工验收与试运行阶段等几个阶段来论述。
Moreover, project management procedure and task document emphasis on the phases of setting and deciding a project, design, construction, purchase and finishing and pre-running.
本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。
The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.
对公路工程施工阶段的造价管理进行了剖析,并提出了加强管理的办法。
Analyzing cost management on road project construct section and advance the method to strengthen management.
改变以往设计、施工、管理各阶段脱节,设计可靠性高、制造可靠性低、管理可靠性保障体系不健全的局面。
Unsound complexion, which design, construction and management is out of joint is altered, namely design reliability is high, made reliability is low and management reliability is unfit.
阐述了石油化工给排水工程施工管理中施工准备、施工、试验与验收三个阶段的措施。
A description of the measure for construction preparation, examination and check and accept in petrochemicals feedwater and drain engineering construction management is made.
建设实施阶段,建设单位在招投标、合同管理、材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效地控制工程造价。
Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.
本文就现阶段房屋建设工程施工建设中的现场管理科学化措施展开详细论述。
In this paper, at this stage in the construction of the building housing construction site management measures to expand the scientific detail.
本文就现阶段房屋建设工程施工建设中的现场管理科学化措施展开详细论述。
In this paper, at this stage in the construction of the building housing construction site management measures to expand the scientific detail.