采取集中施工,降低施工费用;
Adopted centralization construction to reduce the operating charges;
施工费用超过了预算。
从而使施工费用大大降低,提高了施工效率。
So the construction cost is greatly reduced, and the construction efficiency is improved.
该技术具有施工费用低、效率高、经济效益好等特点。
The technology is characterized by low construction expense, high efficiency, and high economic benefit.
铁路工程路基施工中,材料费用占总施工费用的60%以上。
In subgrade construction of railway engineering, the total cost of construction materials costs of more than 60%.
而地震资料野外采集施工参数的选择又很大程度地影响着施工费用。
And the selection of the operation parameters for the field acquisition of seismic data influences the expense greatly.
【优点】:基础施工费用低安装,维修方便,通风良好,维护简单,无积水。
Advantages: low cost of foundation construction installation, easy maintenance, good ventilation, simple maintenance, no water.
该配置具有物理分散性好、可靠性高、主机负荷轻、精度高、施工费用少的特点;
The system disposition is characterized by good physical dispersivity, high reliability, light load for main machine, high precision, less construction cost and so on.
隧道涌水不但影响施工进度、施工费用、稳定和安全,也会引起地下水位的下降。
The groundwater inflow into a tunnel affects not only the construction schedule, cost, stability and safety, but also the groundwater level.
由于在构件的生产过程中对雇用的工人技术水平要求不高,因而施工费用会有所降低。
Since unskilled labor is mainly employed in the production of the units, construction should prove to be less costly.
本实用新型具有施工速度快、运输方便、操作简单、施工费用低,有利于环保的优点。
The utility model has advantages of fast construction speed, convenient transportation, simple operation, low construction cost and environment protection.
在充分与客户的讨论过程中,我们将全面考虑施工费用,施工进度和质量控制等一系列问题。
Based on thorough discussions with the customer, we will take the factors of construction expense, construction progress and quality control into full consideration.
在输电线路工程实际运用中解决了河流封航、进度、安全、环境破坏的关系,降低了施工费用。
In the practical application of power transmission lines to solve the river sealed route, schedule, safety, environmental damage relationships, reducing construction costs.
以硫酸冷排地面为例,与砌筑花岗岩、浇筑沥青地面施工方法、施工费用及使用效果等进行比较。
The method is compared in construction cost, durability with masonry granite and poured asphalt adoption, it shows an economic and reliable anticorrosive method.
它可不开挖跨路面、铁路和河流铺设下水道,煤气管和电缆管路等,结构简单、工作方便、施工费用低。
It can be used in the laying of sewage, gas pipe or electric cable tunnel without opening the road surface, railroad or riverbed. It is of simple construction, easy operation and low cost.
能缩短工期,节约开支50 %以上,一般多层节约施工费用50 %,高层建筑能够节约费用70 %。
Can reduce the time, saves pays wages above 50%, generally the multi-layer saves the operating charges 50%, the high-rise construction can save expense 70%.
无论承包人出于何种原因所造成的超过允许范围的超挖以及这部分超挖的回填,所有材料和施工费用均由承包人负责。
The cost of all materials and construction for the overreach beyond the allowed range made by the Contractor for whatever cause including backfill of over-excavation are the Contractor's liability.
通过仿真分析,可以对施工机械的机型、数量以及作业参数作出最佳选择,并且预测出施工的最短工期和最低施工费用。
By simulating analysis, the optimal parameters, Numbers and type of construction machinery can be obtained, and the smallest cost and shortest period of construction projects can be predicted.
针对多元复合缓速酸提出了单阶段酸化工艺,该工艺使传统的多段注入工艺简化为一段注入,简化了施工步骤,节省了施工费用。
This paper brings about the single stage treatment, which replaces multistage treatment, so it can simplify treatment processes, and save treatment expenditure.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
结合工程实例介绍了水泥浆液的配制,压浆设备及施工操作要点。在工业与民用建筑工程事故处理中,因其用工少、用料省,施工费用低,有广泛的应用价值。
Introduce the confecting of cement serosity mud-jack equipment and construction points according to engineering examples, the brood value owing to using fewer workers, less material and its low cost.
然而,这还包括邮寄费用由施工扩建工作。
However, this Posting also includes the construction costs from expansion work.
我们可以通过四个指标来评价现场施工的成绩,即质量、时间进度、费用和安全。
We can evaluate the results of field construction by four criteria, which are quality, time, cost and safety.
着重论述了本条款在公路投标、施工组织、工程进度、工程质量、工程费用、合同管理各个阶段中的应用。
In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.
因为施工人员费用大大提升!
我们主要的计划工作项目包括费用预算和施工进度。
Our major planning items contain estimating of cost and construction schedule.
土钉墙支护技术以其费用少,施工简便在基坑工程中得到广泛应用。
Soil nailed walls support technology is wide applied in foundation pit engineering because of low cost and simple construction.
对管垢样进行分析和对药剂配方的室内研究及现场试验表明:该工艺简单、施工方便、费用低,取得了良好的增注效果。
To formulations of agent by the laboratory study and site all shows: the technology has the good results of treatment scale, low cost and easy to operate.
对管垢样进行分析和对药剂配方的室内研究及现场试验表明:该工艺简单、施工方便、费用低,取得了良好的增注效果。
To formulations of agent by the laboratory study and site all shows: the technology has the good results of treatment scale, low cost and easy to operate.
应用推荐