2日上午,西安地铁一号线洒金桥站施工现场发生塌方事故,两名工人被埋身亡。
The Sajin Bridge subway station under construction in Xi'an caved in Sunday morning, killing 2 workers.
而在2006年,因南京地铁二号线施工,又有近200棵梧桐被移除。
Nearly 200 more were removed to build Nanjing Subway Line Two in 2006.
1号线(黄岛段)也全面进入车站主体施工阶段。
Line No. 1 (Huang Daoduan) also entered the construction phase of the main station.
介绍了起重气袋技术在运营线“天窗时间”更换桥梁施工中的应用情况。
This paper introduces a newly-developed technique of using pneumatic lifting bags for repairing bridge projects of the operating line.
施工前放出墩身中心线和外轮廓线的准确位置。
Before the construction exact location of Central Line and external contour line of the pier is set out.
把椭圆线简化为四段圆弧,是手工作图或施工放样的常用方法。
It's the common way to predigest the ellipse to four arcs in hand-drawing or construction lofting.
本文介绍了国道220线朱场桥旧桥改造设计方案及施工措施。
This paper introduced Zhuchang Bridge renewal design project and construction method of national road No. 220.
制作各类活动房、工业植筋工程施工能力,具有钢结构生产线一条,剪、折、弯机等设备。
Manufactures each kind of active room, the industry to plant the muscle project construction ability, has steel structure production line one, cuts, equipment and so on booklet, bender.
提出一种新型肘形进水流道,具有型线简单,容易设计和施工方便等优点。
A new type elbow inlet conduit was proposed, with the features of simple in shape, easy to design and convenient for construction.
位于北京的中科京工环氧地坪公司,一线品牌,精湛的施工工艺,环氧地坪涂料价格特别优惠!
Beijing Branch is located in Beijings Workers epoxy company, brands, superb construction technology, epoxy floor coatings Special Offer!
上海救火队员冒着浓烟跟烈火战斗,这场火灾已让11号线地铁施工人员陷入困境并造成一人死亡留人严重受伤。
Shanghai firefighters brave heavy smoke to battle a blaze that trapped workers underground at a Line 11 Metro construction site and left one dead and six others severely injured.
最后本文利用循环运行网络对大连快速轨道3号线轨道工程施工进行了计算机模拟。
Last, the article applies the method to simulate the engineering of No. 3 of Dalian Quick Railway.
国际石油合作项目的现场管理,是施工第一线的基础性管理,对项目成败起着关键性作用。
Site management in the international oil cooperation projects is the basic management in the front line of construction, which takes the key role in the success of projects.
分析民用建筑低压配电保护接地系统的选用型式,浅论了系统的保护线(PE)接地装置施工要求。
This article analyzes the selection forms of protection earthed system of low Pressure switch of civil buildings, and studied construction request of guard Wire (PE) earthed system.
利用广州地铁三号线某一工程实例,对连拱隧道群施工工法进行探讨。
The paper discusses the construction techniques of a group of multi-arch tunnels in a project of Guangzhou metro Line No.
为保证成桥线,对主桥施工进行了位移监测。
We also measured the displacement of major bridge construction for line type precision.
在误差允许范围内,采用简易方法自行延长巷道中腰线,以减少施工影响。
Within the error rang allowed, adopt simple and easy method to automatically prolong middle line of tunnel in order to reduce the influence to construction.
铁路营业线施工是铁路事故多发点。
The construction of running railway line may cause accidents frequently because of ill safety management.
铁路增建第二线、公路拓宽等工程的改造施工,近距离增建隧道是困难的。
During remoulding the railway and the highway, there are many difficult with small distance construction.
针对焊管生产线工程中一些由土建设计、施工带来的直接影响设备安装精度、周期等问题,提出了相应的控制措施。
It raises the relevant control measures aimed to effect units installation accuracy, cycle problem, etc. caused by civil design and construction during welded pipe production line project.
施工阶段的黄金线在圣盖博谷,从下到洛杉矶安大略机场。
Construction phase of Gold Line in San Gabriel Valley from down to L. A. Ontario airport.
因大挑臂盖梁跨线桥体积大、质量要求高,给施工带来很大困难。
Because of the big volume and high quality demands great difficulties accrue in construction.
在隧道爆破开挖中,频繁反复的爆破冲击动压力对隧道设计轮廓线、施工误差和围岩的稳定性等有很大影响。
The impulsive dynamical pressure from frequent blasting has a strong influence on designed tunnel contour, construction error and stability of surrounding rock in the course of excavating tunnel.
分析了传统线夹发热的原因,介绍了一种新型线夹—H型线夹的优点、施工工艺及其试验和应用情况。
The advantages, construction technology and its test and application conditions for a kind of new wire connector, H type line clamp, were introduced.
结合秦沈线施工特点,具体指出路基采用细粒土、粗粒山皮土和级配碎石几种具有代表性填料进行填筑的技术要求。
Considering the features of the construction of this line specific requirements are specified in the filling such as filling with fine earth, coarse mountain surface soil and graded crushed stones.
地块目前为地铁一号线深大站的施工工地,地铁土建部分和土方回填已经施工完成。深大站于2009年9月底投入运营。
The site is now construction site of Shenzhen University station, which has been finished, and the station has started its operation at the end of September, 2009.
高速公路跨线刚拱桥的主拱圈施工中,一般采用支架现浇施工。
Bracket moulding method is adopted popularly while rigidity over line arch bridge main circle construction is proceeding.
施工中解决了相贯线的自动切割和施工质量管理及大跨度桁架的安装等关键问题。
During construction, key problems including automatic cutting of through line, construction quality management, as well as erection of large-span truss were solved.
介绍了在路基、面基层施工中采用的一种简便的施工方法“一线控制施工法”及它的特点和应用性。
The text introduce a handy method during subgrade or pavement base construct named" one line" method, and showed its peculiarity and applicable performance.
以宿淮高速公路段五河口斜拉桥为工程背景,阐述采用索力对主梁应力的影响线法来优化PC斜拉桥施工索力的方法。
Taking the Wuhekong bridge as the engineering background, the method of optimization of cables tensions for PC cable-stayed Bridges is set forth, based on the method of I.
应用推荐