阐述了瀑布沟水电站土坝施工用的砾石土条筛、振动筛及长距离皮带输送机等的技术特点和布置。
The technical characters and deployment of the belt screeners, shaking screeners and long-distance belt conveyors for earth dam construction of Pubugou Hydropower Station are described.
甲方在合同规定开工日期前7天,不能向乙方交付施工场地、进场道路,施工用水或电源未按规定接通,影响乙方进场施工的。
Before 7 days of starting time, that Party a can't consign construction yard, approach road, construction water and power isn't connected by regulations have an impact on Party b's construction.
施工中所用的电(机械施工用电)已接至现场或将能够较方便地接至现场。
Used in construction of electricity (mechanical construction electricity) has been connected to the site or will be able to connect to the site is more convenient.
施工中所用的电(机械施工用电)已接至现场或将能够较方便地接至现场。
The electricity which is used for the construction (electricity for mechanical construction) has been connected to the operating site or can be easily connected to the site.
结果表明,按照拼接区的实际受力进行设计,不仅拼接用料和施工用时较少,而且抗震性能有所提高。
Results show that splicing joints designed according to the actual force at splice joint center can not only save connection materials and construction time, but also improve its seismic property.
对工艺要求齐备施工用材料设备工具,对有害和有污染的材料应设专人室保管。
Arrange appointed person to keep the material equipment tools which have high technology requirements and also the harmful and polluted materials.
整个项目从设计到施工用了三个月,对于只有30平方的店面可谓是精雕细凿。
We spent 3 months from design to finishing construction. It is a precise project for store with only 30 square meters.
采用沉井法施工大口径水源井可解决施工用淡水的问题。
This problem can be resolved by using submerged well method for constructing big diameter water sources well.
尤其适应于封堵高渗透、大孔道地层,且现场施工简便、施工用量少、成本低,取得了很好的应用效果。
It is especially suitable for plugging high permeable, macro pore path formations and convenient for field operation with a small amount of volume and a low cost, obtaining a good effect.
为了解决陕北油田压裂施工用水短缺的问题,研究应用油田回注污水配制水基压裂液。
In order to solve the shortage of fracturing water in the Shanbei Oilfield, a study is initiated, it is intended to prepare water-based fracturing fluid using re-injected wastewater.
研制新型的铁路隧道施工用通风机,是解决长隧道施工通风技术的关键。本文是这项科研课题的阶段性成果。
The development of a new type of axial flow fans used in railway tunnelling is the key research project for solving the difficult problem of ventilation in the construction of long tunnels.
文章指出施工用水是两岸地下水位抬升的重要原因。
It is pointed out that the water for construction is the main factor leading to the groundwater level rise.
建筑施工用斜开多气孔塑料安全帽作用是,防止工作中垂直坠物和人体坠落造成的伤害事故。
The oblique open multi-stoma plastic safety helmet used in the building construction prevents the injury accidents caused by the vertical falling matter and the falling human body.
建筑施工用斜开多气孔塑料安全帽作用是,防止工作中垂直坠物和人体坠落造成的伤害事故。
The oblique open multi-stoma plastic safety helmet used in the building construction prevents the injury accidents caused by the vertical falling matter and the falling human body.
应用推荐