这减少了施工时间和对于邻居的噪音、灰尘等干扰。
This reduces the construction time and nuisances for the neighborhood (noices, dust, etc…).
建筑理念基于两个因素:客户的内在本质和较短的施工时间。
The architectural concept stands on two factors: the intrinsic nature of the customer's operations and the short time of construction.
改造方案费用低,施工时间短,在电机的设计中采用最大静力矩的计算原则。
The modification was low_costed, needing only a short construction time. The maximum static moment calculation criterion was adopted to design the driving motor.
另一种可能性是使用简单的现场装配组件制造设备,保证质量并且降低施工时间。
Another possibility is to use simple on-site fabrication facilities to aid quality assurance and to reduce construction time.
其他设计考虑包括冻结效应、有限的粗粒和堆石料、短施工时间和燃料溢出保护。
Other design considerations include frost effects, limited availability of granular and rockfill materials, short construction period, and spill containment.
项目将设施和室内整合在建筑自身,这种方法不仅方便维修,还节省了很多施工时间。
This approach of integrating the services and interiors in construction itself doesn't only make it easy to service; it also saved a lot of time off construction.
大坝混凝土施工是百色水利枢纽主体工程施工的关键,施工时间短,工程量相对较大。
The main dam concrete construction is the key of the Baise WRPP main body project construction. Its working term is shorter and the construction quantity is larger.
采用PN1型喷涂机施工,具有灵活方便、缩短施工时间、降低工人劳动强度等优点。
The practice has proved that the coating has some advantages, such as convenience in constructing, reduction of constructing time and labour intensity.
但是詹天佑证明了他作为工程师的能力,施工时间比原定缩短了两年,建造成本也比预算少。
But Jeme showed that he is an able engineer. He completed the work two years ahead of schedule and under budget.
该施工技术打破了传统的双塔吊施工方式,节省了施工时间,减少了高空作业,降低了施工成本。
This technique has improved the traditional dual tower cranes construction ways, By this way we have saved the time and cost of constructing, reduced works high above the ground.
该施工技术打破了传统的双塔吊施工方式,节省了施工时间,减少了高空作业,降低了施工成本。
This technique has improved the traditional dual tower cranes construction ways, By this way we have saved the time and cost of constructing, reduced works high above the grou...
拖航速度过小,造成平台在海上运动时间过长,增长施工时间,而拖航速度过大,将直接造成平台倾覆;
Towing with small trailer leads to stay in the sea too long and increase the construction period. Instead of big trailer, the platform will overturn;
介绍了一种设备拆除工艺,其不仅节约施工时间,而且工人的劳动强度和施工时的安全隐患有很大程度降低。
It is a problem that has disturbed us for a long time. This article introduces a series of technology about how to remove the equipment.
审批及施工时间估计为3年。 估计费用,建立共同的用户装船和鸡舍为客户提供了300美元, 400米。
Approvals & construction time estimated at 3 years. Estimated cost to build common user shiploader and sheds for customers A$300-400m.
为增加单位天窗施工时间和减少对开行列车的影响,在繁忙区段应尽量安排晚间施工,以实现施工和运输双赢。
To increase the time for unit maintenance gap and tolower the impact to train operation, we should try to carry out construction work at night for the busy sections so...
这个数字化建造和CNC建造的整合减少了建造预算并且改善了施工质量,节约了施工时间,而且没有在建筑完整性上做出妥协。
This combination of digital lofting and CNC fabrication reduced the construction budget and at the same time improved construction quality and speed without compromising the design integrity.
涠洲1 2-1B油田在钻井过程中井下情况比较复杂,钻井作业施工时间长,这对钻井隔水导管的稳定性提出了更高的要求。
During the process of Weizhou12-1B Oilfield we ll drilling, downhole instance is complexity, and drilling time is longer, so drilling riser pipe has to have a good depth stability.
无锡桥联重工设计研究院有限公司提供的高速线材生产线具有技术先进,生产稳定可靠,产品优质,施工时间短,经济效益高的优点。
The wire rod production line provided by MEPC enjoys the merits of advanced technology, reliable production, premium product, short construction time and high economic benefits.
重涂时间的间隔,由施工时的温度和涂膜固化的程度(以手触不粘)来确定。
The interval of the coating time is determined by the temperature at the time of construction and the degree of curing of the film (by hand).
油田常用的丢手工具主要有投球式和液压式两种类型,这两种丢手工具都不能传递扭矩,限制了工具的应用范围,而且投球式丢手工具施工时作业时间长,效率低。
The ball-off and hydraulic releasing tools are used in oilfield, but it can not transfer the moment of torsion and limit their applied range.
施工时变结构体系的弹性特征值和拆模时间都影响楼层承担的最大施工荷载比率(荷载比率定义为结构承担荷载与楼板自重的比值);
The elastic characteristic value of time-dependent structures and the time of shore removal, both have effects on the ratios of maximum construction loads borne by floors.
施工时变结构体系的弹性特征值和拆模时间都影响楼层承担的最大施工荷载比率(荷载比率定义为结构承担荷载与楼板自重的比值);
The elastic characteristic value of time-dependent structures and the time of shore removal, both have effects on the ratios of maximum construction loads borne by floors.
应用推荐