• 但是运用升降式脚手架无法进行济南伸缩施工作业

    But lifting scaffolding can not be used for construction work of Ji 'nan telescopic awning.

    youdao

  • 如果无法进行地热加温试验原则上施工而且地上绝对允许打眼防止破坏加热盘管

    If you cannot test geothermal heating principle to the construction, and the ground is absolutely not allowed to drill hammer and hammer nails, to prevent the destruction of the heating coil.

    youdao

  • 沥青混合料施工配合比设计道路施工中的一个关键环节传统的“平衡面积”,需要进行多次手工计算工作量大,产生误差,并且无法进行经济分析。

    Asphalt mix design is a key tache in the construction of roads. The traditional method is trail calculation by hand. The speed is slowly and it is easily to make mistakes.

    youdao

  • 隐蔽工程是那些施工完毕后一道工序的继续施工遮盖无法难以再对它进行检查的那些分部、分项工程。

    The concealed work refers to those divisional and partial constructions which will be covered by the next procedure soon after they are completed and are unable or difficult to be re-examined.

    youdao

  • 以前主管部门一直无法利用仪器钻井深度地理位置进行量化管理,难于野外施工进行有效质量监控

    Previously, authorities have been unable to manage the drilling depth and location of wells by the equipments, and monitor the quality of the wild project.

    youdao

  • 以前主管部门一直无法利用仪器钻井深度地理位置进行量化管理,难于野外施工进行有效质量监控

    Previously, authorities have been unable to manage the drilling depth and location of wells by the equipments, and monitor the quality of the wild project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定