• 通过有关结合单位有关施工经验确定箱梁满堂支架施工方案

    Through related examines calculated that unifies my unit related construction experience, definite cast-in-place box Liang full house support plan of construction.

    youdao

  • 本文结合上海市青浦区蒸浦大桥施工实践,简要介绍了钢筋混凝土杆拱桥支架施工工艺

    In the light of the construction practice of Zhengpu bridge in Qingpu District, Shanghai the paper introduces the process of construction without supports of reinforced concrete tied arch bridge.

    youdao

  • 通过模板安装支架施工改进达到了预想效果从而为新材料模板工程的施工指明方向。

    Through the improvement of the installation of form and the unsupported construction, the expected effect is achieved. Thus the direction of constructing form with new material is point out.

    youdao

  • 研究目的预应力混凝土连续采用满布支架施工时,常常因为现场浇注混凝土量过大,而不得不分段进行施工

    Research purposes: the segmental casting method is often used in the full framing construction of prestressed concrete continuous girder because concrete casting in-site is too much.

    youdao

  • 一般情况,弱电施工在线缆敷设完毕即可高一段落接着安装设备支架安装设备。

    In general, the construction of the line can be completed in a small paragraph. Then install the equipment bracket, installation equipment.

    youdao

  • 介绍钢管支架施工工艺控制要点

    The paper introduces construction technics and control point of bowl fasten mode steel tube bracket.

    youdao

  • 接着介绍了现浇支架施工预拱度计算方法设置方法。

    Then calculating methods on construction camber of cast-in-place beam scaffold and setting methods are introduced.

    youdao

  • 支架形式选择,考虑现场施工条件高度还应考虑经济成本尽量就地取材。

    The choice form, should consider the spot construction term and the high degree of the hat beam, should still consider the economic costs with can acquire necessary material locally to the best.

    youdao

  • 本文介绍了箱型薄壁支架提升模板施工工艺

    This paper introduces the construction technology of no stand hoisting template for high pier of box and double wall thin wall pier.

    youdao

  • 最后阐述了施工支架重要性给出了预留沉降

    Finally, the importance of compression in advance in construction of scaffold has been emphasized and values have been given.

    youdao

  • 本文重点介绍该桥南岸支架设计主要施工特点

    This article introduces mainly the design and main construction characteristic of the cast-in-place segment support in Nan 'an.

    youdao

  • 详细介绍海滩地区现浇支架设计施工情况。

    This paper elaborates on the design and construction of cast-in-place beam bracket in the beach region.

    youdao

  • 重庆奉节长江大桥介绍其采用支架现浇施工技术

    Takeing the side span of Chongqing Fengjie Yangtze River Bridge as an example, this article introduces the construction technique for cast in-place of the bridge with high supports.

    youdao

  • 为桁架式双拱肋,钢管纵向13制造,采用支架缆索吊机安装钢绞线斜拉施工

    The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.

    youdao

  • 工程实践证明运用在上架设现箱梁支架施工方法能够保证中小桥梁河道通航泄洪的要求。

    As a proof of engineering practice, the method of construction techniques of cast-in-site girder of bridge could ensure the waterway of small and bridge.

    youdao

  • 提出了RC作为先期的跨越结构后期高强石砌体砌筑施工支架最终由石砌体和RC拱肋共同形成主拱的构思。

    RC-masonry combination arch bridge makes rc arch ribs as former spanning structure and falsework of upper masonry's construction. Finally, reinforced concrete and masonry together form arch ring.

    youdao

  • 安全顺利完成如此重量支架安装施工结构受力复杂,吊运难度大。

    To complete the installation and unloading of steel bracket of such great weight smoothly involves complex structure stress and many difficulties in swing.

    youdao

  • 钢管混凝土系杆拱桥系梁支架搭设施工支架基础承载能力支架自身稳定性工程的关键

    The foundation's bearing capability under the bearing bracket and the stability of the bearing bracket are the key points in the construction of the under supporting steel pipe concrete arch bridge.

    youdao

  • CCTV主楼底板施工针对底板厚度大、钢筋特殊等情况,选用型钢支架作为上层钢筋支撑,保证了底板施工安全。

    In the construction of CCTV main building bedplate, the shape steel brackets are used as supports for upper steel reinforcement according to some special characteristics of the bedplate.

    youdao

  • 介绍了某工程采用模板支架设计要点一些特殊节点所采取的构造措施基础处理荷载试验以及施工所取得的效果

    Author introduces the design key points, construction measures at some special joints, basement disposal, load tests, and construction effect of a gate scaffolding applied in a project.

    youdao

  • 简要介绍该桥刚架支架浇筑方法工艺、卸拱工艺以及施工出现问题处理方法

    The casting procedure of the arch trestle, technology of arch sealing and removing, as well as measures dealing with the problems occurred in construction are briefly introduced.

    youdao

  • 另外剪刀模板支架整体稳定起了很大作用,施工重视剪刀撑布设

    Furthermore, bridging has more important use in formwork support overall stability, the layout of bridging should be paid more attention in construction.

    youdao

  • 施工过程中常用支撑方法有满堂支架横穿型钢法、预埋钢板法、抱法等。

    In the slab beam construction, common support methods include full support method, cross shape steel method, embedded steel sheet, holt hoop iron method, etc.

    youdao

  • 本实用新型比目前常用锚杆对中支架施工方便快捷成本效果

    Compared with common anchor centering bracket, the anchor rod with centering rings is more convenient and rapid in construction, has low cost and good effect.

    youdao

  • 高速公路线拱桥施工中,一般采用支架施工

    Bracket moulding method is adopted popularly while rigidity over line arch bridge main circle construction is proceeding.

    youdao

  • 主要研究成果如下支架系统桥梁施工过程中的应用做了研究,总结支架支撑倒塌原因

    The chief achievements are as follows: The dissertation studys the application of bowl scaffold bracing system in the bridge construction, and summarizes the reasons of falsework collapse.

    youdao

  • 详细介绍了海滩地区现支架设计及施工情况。

    The application of full space supports in construction of cast-in-place box beam;

    youdao

  • 主要介绍脚手架施工支架验算及要求通车情况下钢管架空贝雷受力验算

    The construction of cast-in-situ beam scaffolds and supporting bracket calculation are introduced in this paper.

    youdao

  • 使用全自动数据采集设备处理系统,对每一工况支架、拱圈应力进行适时监控确保施工过程中支架安全

    Timely monitor of their stress in each working conditions can ensure the safe of support and main arch circle with full-automatic data acquisition system.

    youdao

  • 使用全自动数据采集设备处理系统,对每一工况支架、拱圈应力进行适时监控确保施工过程中支架安全

    Timely monitor of their stress in each working conditions can ensure the safe of support and main arch circle with full-automatic data acquisition system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定