• 接头较好适应地基均匀沉陷小心防渗结合部应力集中

    The soft joint can suit to the nonuniform settlement of foundation and decrease stress concentration at connection part.

    youdao

  • 结果表明渗漏原因分析合理纠正预防措施得当,成功地解决薄壁地下连续施工接头渗漏质量通病

    It is concluded that the common quality defects of leaking joints in the thin diaphragm walls could be rectified and prevented by rational research of seepages causes and proper treatment.

    youdao

  • 地下连续接点柔性改为刚性口管施工工艺也起了相应的变化

    The change from flexible connector into stiff connector in the construction of continuous underground-wall brings about the changes of locking pipe, hollow jointer and construction technology.

    youdao

  • 接头管法连接由于快捷高效节能、低耗施工工艺,为目前地下连续施工普遍应用接头处理新技术。

    Now the pipe-joint technology is universal used in the linking construction of the diaphragm wall because of its connection speed, high-performance, energy-saving, low consumption.

    youdao

  • 调节螺丝就是锁定螺丝,位于主体接头执行机构气源压力外部装置。

    Stop Adjustment Screws as well as Locking Screws located in Body Adapter. This is external to Actuator Air Pressure Chamber.

    youdao

  • 连接技术地下连续施工中的一关键技术,接头施工质量好坏直接影响地下连续设计功能

    The technology of the wall linking is the key point for the diaphragm wall construction, the quality of the linking construction will impact direct on the designing features of the diaphragm wall.

    youdao

  • 地下连续接头形式进行了总结探讨;对接头渗漏原因进行分析,介绍接头防渗堵漏技术

    In this article, the author concludes and discusses joint forms of underground continuous walls, analyzes reasons of joint leakage, and states several joint impervious and leakage-block techniques.

    youdao

  • 连续接头采用接头接头型钢法,均取得较好的效果

    The continuous wall junctions are connected by the methods of junction pipe method, junction plate method and section steel pillar method and good effectiveness has been gained.

    youdao

  • 施工完成后通过开挖取芯检查防渗接头质量符合要求

    The inspection of completed impervious cores through excavating exploratory pits and core extraction shows that the quality of the impervious core body and its joints meets the design requirements.

    youdao

  • 地下连续接头采用预制钢筋接头连接端头辅以深层搅拌加固地基

    The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.

    youdao

  • 地下连续接头采用预制钢筋接头连接端头辅以深层搅拌加固地基

    The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.

    youdao