• 拒绝频率要么暗示品质工作要么暗示不良文档评审过程任何一个都可以严重影响成本进度以及客户满意度

    High rejection counts would suggest either poor quality of work or a poor document review process; either could adversely impact cost, schedule, and customer satisfaction.

    youdao

  • 大多数情况下,在需求评审找到一个需求问题要比等到程序设计好、编码好,构建以及测试好之后找到成本要低多。

    In most cases, finding a requirement problem in a requirements review is far cheaper than waiting until the application is designed, coded, built, and in testing to find the problem.

    youdao

  • 本次国际咨询的奖金设计成本补偿费主办方正式公布评审结果30个工作日支付

    The awards and design compensation cost will be paid within thirty (30) days after the appraisal results are officially released by the organizer.

    youdao

  • 组织必须识别制造过程设计输入要求形成文件进行评审包括以下内容:生产率,过程能力成本目标

    The organization shall identify, document and review the manufacturing process design input requirements, including targets for productivity, process capability and cost.

    youdao

  • 工作进行复查评审这样节省成本

    Review and inspect the work, it will lower costs.

    youdao

  • 多个角度分析了成本经济属性,对成本价的评审理论进行了深入地探讨得出数学模型,据此理论展开了成本评审方法研究。

    The paper analyzes the economy attribute of cost price from multi-opinion, and develops a mathematic model on the basis of the discussion of the theory of cost evaluation, and also studies the method.

    youdao

  • 本文研究所得出主要结论如下1商务评审中,成本固定酬金占据主导地位,直接关系整个项目费用高低

    The main conclusion gained are as follows:1. In the commercial evaluation, the costs and fixed remuneration dominate a direct bearing on the overall project cost;

    youdao

  • 根据施工项目成本计划,运用成本计划评审时间成本优化法对项目成本进行控制

    According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.

    youdao

  • 本次招标奖金设计成本补偿费主办方正式公布评审结果30个工作日支付

    The prize and the design compensation of this project shall be paid within 30 business days after the sponsor has published the evaluation result officially;

    youdao

  • 奖金设计成本评审结果后60日内一次性支付

    Prize and design cost shall be paid within 60 days after the review.

    youdao

  • 奖金设计成本评审结果后60日内一次性支付

    Prize and design cost shall be paid within 60 days after the review.