第四章分析了战略成本计划与控制。
Chapter Four, it explains strategic cost plan and strategic cost control.
成本计划与控制是现代企业管理的重要内容。
Cost planning and controlling is an important content in modern enterprise management.
微软则表示,这项政策改变是削减成本计划的一部分。
Microsoft has said it made the change as part of a broader cost-cutting plan.
一旦降低成本计划失去了活力,它最终就会消声匿迹。
Once a cost reduction program loses momentum, it eventually dies out.
同时,初步成本计划完全可以不考虑生产、供应和其他相关因素。
At the same time, the initial cost planning is something that poorly can be done without getting information about manufacturing, supply and other related elements.
事前成本控制主要包括成本预测、成本决策和成本计划三项内容。
The cost control in advance includes cost forecast, cost decision and cost planning.
成本计划的实质就是使建筑师在设计时将工程成本控制在目标范围以内。
The essence of cost planning is to enable the architect to control the cost of a project (within the target) while he is still designing.
而成本计划,作为成本管理的重要组成部分,其重要性也就日益突显出来。
As an important part of cost management, cost planning is more and more important.
研究了施工项目成本计划的制定过程,包括成本计划的内容和表达方式等。
The process of establishing the cost plan of the construction project is studied, including the contents and narration of the plan.
该模型实现了对工程项目成本的动态管理,使企业能够实现工程项目成本计划目标值。
So, it can realize the achieve dynamic management of engineering projects cost and assure that enterprise realize target value of engineering project cost.
根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。
According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.
考虑附加的成本:您可能需要考虑开发或购买转换的成本,但是谨慎的成本计划可以确保长期内的成本降低。
Consider the additional cost: You may need to consider the cost of developing or buying transformations, but careful cost planning will ensure that there is an overall cost reduction in the long run.
对于作业成本管理的的实施通过成本计划、成本控制、成本核算和成本分析及考核等方面进行了讨论。
The advantage of ABC lies not only in the accuracy of cost calculation, but in advanced Activity-Based Management.
如何在多企业协作环境下进行有效的协同项目成本计划与控制,是许多研究者和管理者重点关注的问题。
Many researcher and manager focus on how to plan and control the cost of projects effectively in a multi-enterprise cooperating environment.
项目成本管理包括与成本计划、成本估算、成本预算、成本控制相关的过程,用以确保项目能在核准预算内完成。
Project cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget.
其次对项目中涉及到的成本类型进行了研究,然后结合稽征网络管理信息系统的特点制定出了成本计划和控制措施。
Then, through analyzing the cost involved in project management, it formulates the cost plan and control measure for this project.
成本计划的执行方面,从材料成本、人工成本、机械成本、工期成本、质量成本几个主要方面讲述了如何进行项目成本制约。
For the implementation of the cost planning, the thesis explained how to conduct the project cost control from the material costs, labor costs, machinery costs, time costs and quality costs.
虽然刚开始这一进步也许意味着航空公司浪费了数以百万美元进行机上娱乐系统升级,但分析师表示,由于航空公司寻求更多的节省成本计划,他们会对此乐见其成。
Whilst at first it seems this development signals millions of dollars wasted by airlines in IFE upgrades, analysts are saying airlines will welcome it as they seek more cost cutting initiatives.
建筑工程项目成本管理贯穿于工程施工的整个过程,从强化建筑施工项目成本观念,建立施工项目成本预测、成本计划、成本核算以及成本考核等手段来达到成本控制的目的。
The cost management is in the whole process of construction. The purpose of the cost control can be achieved by enforcing cost ideology, planning the budget, and offering cost supervision.
建筑工程项目成本管理贯穿于工程施工的整个过程,从强化建筑施工项目成本观念,建立施工项目成本预测、成本计划、成本核算以及成本考核等手段来达到成本控制的目的。
The cost management is in the whole process of construction. The purpose of the cost control can be achieved by enforcing cost ideology, planning the budget, and offering cost supervision.
应用推荐