• 认识成本进度管理无法分割的。

    Recognize that cost and schedule management are inseparable.

    youdao

  • 构建阶段某种意义上说是一个制造过程,在此阶段要强调资源管理操作的控制,用来优化成本进度质量。

    The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.

    youdao

  • 一方面,项目管理更加关注资源进度成本等方面管理项目计划

    The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.

    youdao

  • 没有完成风险管理之前,项目成本进度无法最终确定。

    Project cost and schedule cannot be finalized without completing risk management.

    youdao

  • 计划进度控制成本控制、质量控制安全控制工程项目管理重要组成部分

    Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    youdao

  • 进度成本质量工程项目管理控制目标

    Time, cost and quality are the most important control objects of project management.

    youdao

  • 项目物料管理直接影响项目成本工程进度

    The management to these materials will affect directly project cost and process.

    youdao

  • 利用软件工程理论开发基于知识管理办公自动化系统能够很好的保障软件开发进度成本质量得到满足用户需求的软件产品。

    The office automated system basing on knowledge management developed with software engineering theory will well control the software development progress, cost and quality, and get proper outputs.

    youdao

  • 文中着重研究项目管理成本质量进度三个方面优化问题,分别提出了优化方法

    The research is mainly focused on the optimization of Project management with Cost, Quality and Progress, puts forward the method of optimization.

    youdao

  • 保证工程质量前提下如何进行进度成本管理项目管理关键

    On the basis of quality, how to carry out progress and cost management is the key of project management .

    youdao

  • 项目管理主要控制要素质量进度成本

    The major control elements for a project management should be its quality, schedule and costs.

    youdao

  • 应用传统成本工期管理已经不能够准确反映成本进度绩效水平,更不能进行信息集成控制

    The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.

    youdao

  • 而挣值管理作为一种新兴项目集成化管理技术能够实现产品研发进度成本质量技术的综合管理控制

    EVM, as a new project integrated management technique, is able to manage integratively and control product development progress, cost, quality and technique.

    youdao

  • 本文论述加强工程技术管理重要性怎样搞好质量管理安全管理进度管理成本管理施工现场管理的方法步骤。

    Importance of strengthening project technical management, and how to carry out quality, safety management, progress management, cost management and construction site management are elaborated.

    youdao

  • 首先要素成本集成管理工程项目管理主要要素”——成本进度质量一个整体奠定了项目全要素集成化管理基础

    Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.

    youdao

  • 其三重点研究了网络企业项目控制管理包括进度控制管理成本控制管理质量控制管理

    Third, project control management of network enterprise is researched, including the progress control management, cost control management and quality control management.

    youdao

  • 综合运用各种项目管理方法手段,有效地保证项目的进度实施成本控制

    By using these project management methods and skills, this project was undertaken successfully following the planned schedule and estimated cost.

    youdao

  • 项目管理审核执行方案及排期,监管项目执行情况、流程进度成本控制,确保良好运行

    Project Management: Audit Implementation Programme, Regulatory implementation of the project to Ensure good operation;

    youdao

  • 负责对本项目进度、质量、成本实施计划组织协调控制决策项目要素实施全过程动态管理

    The development putting the entire proceeding into practice manages the plan, organization, coordination, under the control of and every key element making policy, to the project.

    youdao

  • 项目管理目标保证质量前提下寻找进度成本解决方案,对成本进度有效地控制

    The goal of project management is to find the best solution to pace and cost and then control them effectively. But before doing so, we must know a prerequisite for it is the guarantee of quality.

    youdao

  • 介绍了施工准备阶段施工阶段有关进度质量安全成本合同、信息、竣工具体管理控制方法管理中的难点。

    And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...

    youdao

  • 介绍了施工准备阶段施工阶段有关进度质量安全成本合同、信息、竣工具体管理控制方法管理中的难点。

    And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...