中国正试图通过法律来捍卫向恰希玛出售第三和第四个反应堆的正当性。
China is trying a legalistic defence of the sale of the third and fourth reactors at Chasma.
问:中方向巴基斯坦恰希玛核电站出售有关设备是否应获得核供应国集团的批准?
Q: Should China apply for the approval of the Nuclear Suppliers Group (NSG) before selling relevant equipment to the Chashma Nuclear Power Plant in Pakistan?
介绍了恰希玛核电厂的安全性、可靠性和特殊性,以及应用的法规、规范和标准。
The safety, reliability, specificity and applicable code and standard for Chashma nuclear power plant are described in this paper.
近日媒体报道中提及的恰希玛三期、四期项目,是根据中巴两国2003年签署的有关核电领域合作协议开展的。
The Chashma Project III & IV mentioned in recent media reports are carried out according to the cooperative agreement in nuclear power signed by China and Pakistan in 2003.
以巴基斯坦恰希玛核电站一期辐射监测系统近两年测量数据为依据,对该核电站辐射监测仪表的运行工况进行分析。
According to the radiation monitoring data in adjacent two years' of Chashma Nuclear Power Plant, the operating condition of radiation monitoring instrument is analyzed in the paper.
计算结果表明。恰希玛核电厂乏燃料池冷却系统失效后,只要在19 个小时内修复冷却系统, 不会出现大量放射性物质外泄。
The result shows that if the cooling system of the spent fuel storage pool can be retrieved in 19 hours, the natural circulation cooling ability is sufficient to prevent radioactivity release.