• 竖井开挖采用临时混凝士衬砌护壁措施。

    The temporary concrete lining guard wall method was used in excavating vertical shaft.

    youdao

  • 水电工程竖井特别是竖井开挖主要难点体现竖井开挖速度上。

    The excavation speed of pilot shaft is one of the key difficulties for the excavation of shaft, high ones in special, of hydropower works.

    youdao

  • 竖井开挖过程中,不可避免出现变形稳定性问题

    In process of shaft's excavation, the problem of transformation and stability is unavoidable.

    youdao

  • 蒲石河抽水蓄能电站引水系统中的竖井开挖,拟采用反井钻机进行开挖,人工手风钻钻孔扩挖的方式施工。

    The sequence of excavation for the shaft of diversion system at Pushihe storage power station is to excavate the pioneer well used by back well boring machine, then by hand air drill to expand it.

    youdao

  • 水坝矿山巷道竖井隧洞江河海底隧道地铁地下工程开挖采用注浆防渗帷幕

    Dams, mine tunnel, shaft, tunnel, River Cross Harbor Tunnel, subway excavation of underground works such as the use of anti-seepage curtain grouting;

    youdao

  • 本文介绍了反井钻这新型竖井斜井开挖施工设备以及设备在国内水电工程中的应用

    One advanced construction equipment for vertical and inclined shafts, named Raise Reaming Machines is introduced in this paper, together with its first application in Chinese hydropower project.

    youdao

  • 对于竖井开挖尤其是断面竖井开挖 ,出环节 ,往往决定掘进速度快慢关键因素

    The spoiling is a key factor influencing the advance speed for the shaft excavation, especially for the excavation of large cross section and deep shaft.

    youdao

  • 对于竖井开挖尤其是断面竖井开挖 ,出环节 ,往往决定掘进速度快慢关键因素

    The spoiling is a key factor influencing the advance speed for the shaft excavation, especially for the excavation of large cross section and deep shaft.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定