目前,废旧炮弹拆解主要是在半人工、半自动化状态下完成的,自动化程度低。
At present, dismantling of the waste shells is half conducted by hands and half by mechanization, the automatization is in a low level.
分别根据工程防护和工程爆破理论,对航、炮弹销毁时的弹片、冲击波和振动等安全距离计算进行了对比研究,有关研究结论可供销毁废旧航、炮弹的环境安全评估参考。
Based on the theory of protective engineering and blasting, the damage effects of primary fragments, shock wave and vibration in destruction of bygone aero-bomb and shell are discussed.
分别根据工程防护和工程爆破理论,对航、炮弹销毁时的弹片、冲击波和振动等安全距离计算进行了对比研究,有关研究结论可供销毁废旧航、炮弹的环境安全评估参考。
Based on the theory of protective engineering and blasting, the damage effects of primary fragments, shock wave and vibration in destruction of bygone aero-bomb and shell are discussed.
应用推荐