• 是想逃狱也许会道?

    Then I guess you wanna escape. Tunnel under the wall maybe?

    youdao

  • 为了准备建筑基和道路需进行土方

    General earthmoving will be done to prepare sub-bases of buildings and roads.

    youdao

  • 人工灌注桩高层建筑常用一种桩基础形式施工质量好坏直接影响到建筑的结构安全

    Usually the poured pile by artificial excavation expanding bottom is one foundation pile style of tall building, whose quality can affect the structural safety of the construction directly.

    youdao

  • 此外本文计算了相当于天然情况各种水深、各种各种槽内

    In addition, the fields of the every kind depth, ratio of dredged depth and bottom width in national condition were calculated in this paper.

    youdao

  • 该楼框架结构采用人工基础

    The building with frame structure is based on manual cavity expansion pile foundation.

    youdao

  • 文章主要介绍监理工程师人工灌注桩施工过程质量控制

    This article mainly introduces quality control based on supervising engineer in course of the construction about the poured pile by artificial excavation expanding bottom.

    youdao

  • 通过实例介绍人工孔大直径灌注桩工程量计算方法

    The paper illustrates the calculation of the amount of work in man-operated well digging and pile depositing with the bottom enlarged in diameter.

    youdao

  • 吸反循环钻孔扩灌注桩人工灌注桩相比,地质条件适应性强施工安全可靠

    Compared to artificial digging-hole pile, the pumping reverse-circulation under-reamed bored pile has higher adaptability to geological condition, and its construction is safety and reliability.

    youdao

  • 根据工程实例情况,人工桩桩标贯试验非常必要

    The standard penetration test(SPT)of base-pile of the artificial bored pile is very essential according to the feature of this project.

    youdao

  • 人工直径具有承载能力,结构简明,地质条件合适沉降优点

    Large diameter bulb pile constructed by manual excavation has many advantages, such as high bearing capacity, direct load transfer, and little settlement on proper geological conditions.

    youdao

  • 矿用电缆沟不得超过标高个别地方时,其处理方法应取得设计单位同意

    Ultra excavation: cable trench excavation shall not exceed the bottom elevation. If ultra-dig in some places, obtain the consent of design units.

    youdao

  • 矿用电缆沟不得超过标高个别地方时,其处理方法应取得设计单位同意

    Ultra excavation: cable trench excavation shall not exceed the bottom elevation. If ultra-dig in some places, obtain the consent of design units.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定