学生平均每天要花三个小时来完成作业,但是如果遇到难题,完成作业的时间就得延长。
On average, students have to spend 3 hours finishing homework every day, but if we are stuck by difficult questions, the time will be extended.
在工业工程中,生产线平衡率是衡量生产线各工序作业时间平均化状况以及生产线生产效率的指标。
In engineering, line Balancing Rate is the quota that measures the average situation of every cycle time in working procedure and the production efficiency on processing line.
我对这资料做的第一件事是计算十二个作业中的每一个所花费的时间的平均值、最小值、极大值和标准差。
The first thing I did with this data was to calculate the average, minimum, maximum, and standard deviation of hours spent on each of twelve assignments.
主导生产工装夹具的制作。为生产制作作业指导书并提交发行。设定产品生产单件平均时间。
Take lead in jigs and other tools creation for production. Create Work Instruction and submit for release. Define production routing time for new products.
评价作业调度算法优劣的性能指标:作业平均周转时间还有作业平均带权周转时间。
Evaluate the function index sign that the homework adjusts one degree calculate way good and bad: Average turnover time of homework, The homework takes power turnover time equally.
对我国东部地区某三维地震数据进行了处理,用请求分配作业的主从模式比平均分配作业的主从模式节省了23.68%的时间。
The Job-by-Application master-slaver scheme saved 23.68% time by using Job-by-average-allocation master-slaver scheme in processing one of 3D seismic data in eastern China.
对我国东部地区某三维地震数据进行了处理,用请求分配作业的主从模式比平均分配作业的主从模式节省了23.68%的时间。
The Job-by-Application master-slaver scheme saved 23.68% time by using Job-by-average-allocation master-slaver scheme in processing one of 3D seismic data in eastern China.
应用推荐