• 他们估计该工程费为五万美元。

    They costed the construction at $50, 000.

    youdao

  • 直接工程费直接其他直接费组成。

    The "direct engineering fees" consists of direct fees and other direct fees.

    youdao

  • 最后几何优化泵房沉井基础的工程费估算作了应用性探讨。

    Finally, the original cost estimation of open caisson pump house is made with the geometric optimization.

    youdao

  • 厨房经过翻修同时限定额外工程费材料覆盖原有橱柜

    The kitchen was also revamped while limiting the additional cost of work: covering of existing cupboards with new materials and creation of high benches.

    youdao

  • 详细介绍通信建设建筑安装工程费构成基础上分析了各项费用计算取定方法

    On the basis of the presentation of components of communication project installation fee, the calculation and selection methods of each fee are analyzed.

    youdao

  • 解决实际问题节省了大量措施工程费,使工期大大提前,为同类工程提供参考

    It resolved the actual issue and saved the cost of project, shortened the period. Also it could supply the reference in the interest of the same projects.

    youdao

  • 工程量清单计价模式下工程造价分部分项工程费措施项目其他项目费、规费税金等构成。

    When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.

    youdao

  • 工程改良土壤494万立方米立方米土方节约直接工程31节约工程费1.53亿元。

    This project improves soil 494ha. Each cubic meter soil could save the cost of 31yuan, totally save the cost 153 million Yuan.

    youdao

  • 建立程控交换电话网络实现电话通信需要大量设备线路费、维护费工程费费用,并且需要一定的施工工期。

    Instructing the switching network to realize the telephone communication needs much of equipment charges, lines charges, protection charges, project charges and time.

    youdao

  • 在四川盆地地震勘探工程,地震资料野外采集施工费用地震工程预算中的直接工程费整个地震勘探工程成本的80%左右。

    The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.

    youdao

  • 工程成本控制主要放在内部管理上,特别是直接工程费工期有效控制,其次外部市场因素和施工阶段的变更索赔也是着重考虑的一个方面。

    The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.

    youdao

  • 工程成本控制主要放在内部管理上,特别是直接工程费工期有效控制,其次外部市场因素和施工阶段的变更索赔也是着重考虑的一个方面。

    The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定