而工程造价制约效果的好坏常受到多方面因素影响,立项、设计、施工、竣工等每个过程都会影响到造价的高低。
While the quality of engineering cost control effect is often influenced by many factors, the project, design, construction, completion and so on each process would affect the level of the cost of.
工程项目评估是投资决策和项目立项的主要依据。
Engineering project Evaluation is the main basis for capital investment decision and approving and initiating a project.
工程预可行性分析是桥梁和隧道建设前期工作的重点组成部分,往往成为项目立项的控制性因素。
Project pre-feasibility analysis, a crucial part of bridge and tunnel preparatory work construction, often becomes a controlling factor of a project.
文章系统地介绍了该试点工程的立项背景、设计原则、设计要点、完成的主要工作、系统的主要功能及主要特点。
This article presents the aims to launch the pilot program, its design philosophy. core elements, accomplishments, main functions of the system and characteristics of the project.
建设工程造价管理贯穿于工程建设全过程,从工程建设立项到工程项目决策每个环节都存在着造价管理。
Construction engineering cost management throughout the whole construction course, from engineering construction project to project decision-making every link exists cost management.
建筑工程项目的启动需要经过项目立项、可行性研究、设计、项目计划等阶段。
To start up a construction engineering project should pass through these stages: project establishing, feasibility research, designing, project planning and etc.
这篇报告就是关于网络工程的立项、计划、实施、维护全过程的一个概述。
This report be the item of establish concerning network engineering, plan, puts into practice, support the whole process of a say all.
在基因工程制药选题立项时应首先考虑产品市场风险、研制过程中的技术风险和国家政策法规的修改所带来的风险;
But first of all, the project selection leader must be forethought of the following risks: the changing market, insurmountable technology problems and policy varieties;
摘要:公路工程可行性研究报告是公路建设前期工作的关键,是项目立项和后期施工图设计的重要依据。
Abstract: Highway engineering feasibility study report is critical of the preliminary work of road construction and an important basis for project approval and post-construction drawing design.
核电项目前期文件是指核电工程开工以前在立项、审批、招投标、勘察、设计以及工程准备过程中形成的文件。
Nuclear power project prophase file refers to the documents produced during the project - licensing, approving, bidding, surveying, design, and construction preparation before project kickoff.
水电建设项目在立项、设计和实施的全过程中存在的上述不确定因素,即是水电工程建设项目的风险。
The uncertainties above existing during the process of establishing, designing and implementing the hydropower construction project are the risks of the hydropower construction project.
“渤海海上风力发电示范工程”于2007年初批准正式立项,建设国内第一台海上风力发电机组,容量为1.5MW。
The Bohai Offshore Wind Power Generation Demonstration Project, China′s first offshore wind turbine generating set with a designed capacity of 1.5MW, received regulatory approval in 2007.
“渤海海上风力发电示范工程”于2007年初批准正式立项,建设国内第一台海上风力发电机组,容量为1.5MW。
The Bohai Offshore Wind Power Generation Demonstration Project, China′s first offshore wind turbine generating set with a designed capacity of 1.5MW, received regulatory approval in 2007.
应用推荐