由于Netscape失去了市场份额,它将SSL的维护工作移交给因特网工程任务组(IETF)。
As Netscape lost market share, SSL's maintenance moved to the Internet Engineering Task Force (IETF).
对于所有被要求的工程施工和移交,都必须得到业主工程师的批准。
The engineer's approval is necessary to be taken on all the required works and submissions.
第三十九条筹建处在工程建设完成并办理完毕移交手续后,经董事会批准撤销。
Where the project is completed and all the transfer formalities have been met, the preparation office shall be disbanded by the resolution of the Board of Directors.
支持工程的设计、建议书的编制、询价、订货、以及安装、调试、移交和客户培训文档资料等。
Support the development of engineering designs, proposals, quotations and orders together with the installation, commissioning, handover as well as customer training documentation.
工程内容及质量符合要求的,双方签字确认,同时乙方将全部图纸资料移交给甲方。
Should contents and quality is in accordance with the requirements, both Parties should signed to confirm, and Party B should handed all the documents to Party A.
根据甲方的要求,乙方依照《工程建设协议》的约定,于2005年5月5日与甲方共同对工程项目进行初步移交验收。
Party B may, in accordance with Construction Agreement, as well as Party A make joint acceptance and inspection of construction Project as required by Party A on May 5th, 2005.
退役工程经国家验收后,原二二一厂的厂房、设施和场地已经移交青海省安排使用。
After being decommissioned to national acceptance standards, the whole plant-221 was transferred to local government for it's unrstricted use.
承包商在清点完到货设备后,应建立设备及备品备件清单,工程完成之后,与业主办理设备及备品备件移交手续。
The contractor shall make a list of equipment and spare parts after checking the arrived equipment, and hand over the equipment and spare parts to the owner when the construction is completed.
承包商在清点完到货设备后,应建立设备及备品备件清单,工程完成之后,与业主办理设备及备品备件移交手续。
The contractor shall make a list of equipment and spare parts after checking the arrived equipment, and hand over the equipment and spare parts to the owner when the construction is completed.
应用推荐