发展长江经济带是一项系统工程,需要有明确的路线图和时间表。
Developing the Yangtze River Economic Belt is a systematic project which calls for a clear road map and timetable.
必须批准所有工程预算变更,时间表或需求变更。
He has to approve all changes of engineering budget, schedule or requirements.
与工程部工程师沟通,协助准备周的工作时间表以协调工作量的分配。
Assists in preparing weekly work schedules in accordance with workload and priorities in coordination with Engineer.
计划,时间表,并提供培训,WPG,地点可能会被要求或规定,为他们的成绩,并在工程上的努力。
Plans, schedules and provides training for WPG sites as may be requested or required for their success in their engineering efforts.
时间表问题是运筹学领域和系统工程领域中的典型组合优化问题,是由于事件对时间和空间的资源争夺而产生的,属于NP完全类问题。
Timetable problem is a typical problem of combined optimization in the fields of operational research and systems engineering, which belongs to NP problem.
就像任何优秀的工程计画,2.007按照自己的时间表运作!
Like any good engineering project, 2.007 runs on a schedule!
负责投产系统时间表上安排的先期制造工程任务的质量执行。
Be in charge of the quality execution of Advanced Manufacturing Engineering tasks as defined on PLUS timeline.
负责投产系统时间表上安排的先期制造工程任务的质量执行。
Be in charge of the quality execution of Advanced Manufacturing Engineering tasks as defined on PLUS timeline.
应用推荐