• 进度计划优化方法方面,仅以“工期-成本优化”为例,线形规划方法建立求解模型

    As to optimization of the network technique, make emphasis on "time-cost optimization" and set up mathematic model using Linear Scheduling method.

    youdao

  • 如何成本工期质量安全进行全面优化管理施工项目目标集成管理所提出的又一挑战

    How to carries on the comprehensive optimization and the management of cost, time, quality and security, is another challenge to the integrated management of construction project objects.

    youdao

  • 作为施工项目主要目标成本工期质量优化管理一直工程管理界悬而未决问题

    As the essential objects of construction project, the optimized management of cost, time and quality has been the unresolved question of project management.

    youdao

  • 最后模糊决策网络计划工期成本优化方法进行探讨

    At last, it studies the fuzzy duration-cost optimization of decision network planning.

    youdao

  • 介绍公路工期成本优化思路方法提出了公路工程工期成本优化CAD软件设计方案

    This article introduces the thought and method of highway engineering time-cost optimization, and puts forward the CAD software design scheme.

    youdao

  • 本文提出利用列表逐步进行修改,最终得到工期成本优化问题最优的方法。

    This paper introduce the optimal solution to the problem of optimizing time and cost by setting up a tableau and modifying the tableau step by step.

    youdao

  • 随机网络不仅可以解决桥梁施工计划工期优化问题而且合理工期限定资源条件下,可进行施工成本优化

    The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.

    youdao

  • 探讨工程成本时间曲线非线性成本工期优化问题

    The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear.

    youdao

  • 提供整个项目价值工程投入提出设计施工优化方案降低成本提高质量缩短工期

    Provide value engineering input throughout the project and propose changes to the design and construction to reduce cost, enhance quality and shorten the project schedule;

    youdao

  • 文章选取工程项目常用网络图工期成本压缩优化说明如何运用技术方法工期成本进行优化

    This articles selects the optimization method of cost compression that commonly used in the project to illustrate how to use technical methods to optimize the cost of the construction period.

    youdao

  • 文章选取工程项目常用网络图工期成本压缩优化说明如何运用技术方法工期成本进行优化

    This articles selects the optimization method of cost compression that commonly used in the project to illustrate how to use technical methods to optimize the cost of the construction period.