甘特图是工程项目进行工期计划和控制的有效工具。
Gantt chart is an effective tool for planning and controlling project schedule.
本文对项目的工期计划也进行粗略的安排,并提出了项目建设和运营阶段的组织架构。
The thesis also draw a timetable of project implement and the organization structure diagram of both phases of project construction an operation.
对比两种方法的计算结果,尝试找到一个合理的计划工期,对工程原工期计划提出一定的建议。
In contrast of the two methods' results, this paper attempts to find reasonable plan duration and make reasonable proposals to the original project duration plan.
是指焊接班长根据主任给的工期计划,对照施工班组手中工作的实际完成情况,评估是否能够按期完成任务。
Welding foreman, according to the director's construction period plan, actual completion of construction team, evaluate the ability of completing missions on schedule.
预期在计划的总罢工期间会有麻烦,在菲律宾的军队已处于完全戒备状态。
Troops in the Philippines have been put on full alert in anticipation of trouble during a planned general strike.
这次庆典是DISA计划中总部开始建设的标志,新总部面积为100000平方米(1070000平方英尺),工期约为三年。
The ceremony will begin construction of DISA’s planned headquarters, a 1,070,000-square-foot campus facility that will take about three years to build.
如果以俄罗斯所要求29亿美元总额和工期,印度完全可以寻找英国或法国的船厂,去尽快完成与交付俄方的改造计划。
To put these sums and times into context, India could purchase a new carrier from the U.K. or France for $2.9 billion and probably get it delivered as quickly as the Russians are proposing.
在施工期间,车间底漆表面的任何损坏应该用电力工具进行清除,根据涂装计划直接涂第一度漆而不用进行底漆修补。
During construction, any damage to the shop primed surface shall be cleaned by power tools and directly painted with the first coat primer according to paint scheme without touch up of shop primer.
]以挣值管理方法为研究内容,分析工程造价与施工工期集成计划的内涵。
The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method.
对模糊型网络计划,计算模糊工期风险概率是利用模糊事件概率的普通事件概率表示方法,用常规的概率方法求解。
Using the expression way of general event probability to fuzzy event probability, common method of probability can find fuzzy event period risk for fuzzy network planning.
其中包括工程概况、编制依据、施工方案、吊装管理、安全措施、计划工期和应急预案等。
There are project summary, compilation foundations, construction plan, hoisting management, safety measures, project time limit and emergency plan etc.
最后,对模糊决策网络计划工期—成本优化方法进行了探讨。
At last, it studies the fuzzy duration-cost optimization of decision network planning.
决策网络计划技术作为网络计划技术中的一种,也会遇到工期无法准确确定的问题。
Decision network planning as one of the network planning also meets the problem that the duration can't be confirmed accurately.
编制工程进度月计划、周计划以控制阶段工期的如期完成。
Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.
本文还给出了一种简练的函数构造法,用该方法构造的函数能较好地逼近活动工期概率密度函数,方便了对计划网络图的计算机仿真运算。
It also gives a construction approach for approximating the probability density function of activity duration, which will facilitate the computer simulation of the PERT diagram.
就在上个月,荷兰建筑师宣布计划建造世界上第一个3d打印房子出砂,用18个月的建设工期。
Just last month, Dutch architects unveiled plans to build the world's first 3d-printed house out of sand, with a construction time of 18 months.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
经过排水固结法的经济分析及软土排水固结过程中的强度分析,提出了砂井参数及加载计划(工期)的优化设计方法。
By Analyzing the economy for consolidation and the strength of soft clay during consolidation, the optimal design of the parameters of sand well and the loading schedule (project term) is proposed.
项目施工期间协调先关部门所有的活动,并对供应商施工进行计划,安全,质量,和时间管理。
Coordinate the relative department activities during the projects period and manage the contract activities for schedule, safety, quality and deadline.
首先描述六种项目状态下项目进度预测问题,系统阐述计划价值率法、挣得工期法和挣得进度法的进度预测方法。
Firstly, the schedule performance prediction problem in the six statues is described. The plan valued rate method, earned duration method and the earned schedule method are then introduced.
成本计划的执行方面,从材料成本、人工成本、机械成本、工期成本、质量成本几个主要方面讲述了如何进行项目成本制约。
For the implementation of the cost planning, the thesis explained how to conduct the project cost control from the material costs, labor costs, machinery costs, time costs and quality costs.
文章将蚁群算法应用于计划调度的工期-费用优化问题之中,得到一种精确、全面,求解效率高的优化方法。
The paper applies ant colony algorithm to network planning time-cost optimization problems, thereby getting a accurate, comprehensive and efficient solution optimization method.
工期和成本是项目计划中的两个重要目标。
The time limit and cost for a project are two important objectives in scheduling of projects.
本文对网络计划的时间费用优化寻求最优工期的问题,提出了一种改进的优化方法。
This article gives a improved method of seeking for optimum time-cost in CPM.
在矩阵法编制施工组织计划中,采用标号法求最低成本工期。
Applying mark - number method to evaluate the lowest cost construction period within scheduling construction organization plan with martix merhod.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.