在你收集有关范围和可交付物的信息时,你需要制定一张时间表以便获得预估的工时和期限。
As you gather information about scope and deliverables, you'll need to start laying out a timeline so that you can get your hands around estimated effort and duration.
进行工艺文件的编制、工装夹具设备的设计开发、工时制订及考核、制定产品工作流程等。
Compile the process document, design and develop the fixture and equipment, working hour preparation and product flow chart.
处理在线和离线模具问题,与工艺工程师一起制定解决方案并确定维修工时,检查维修结果。
Solve die problem on line and off line, work with process engineer to solve problem and assign work hours to technician, and check the maintenance result.
评估制造成本,制定标准工时,减少资源浪费。
以工艺标准化为基础,研究了制定典型工序的工时定额标准技术。
On the basis of the standardized processes, the technology of setting standard Time criterion of the typical procedure is researched.
制定分班制将能保证矿山工地的员工们轮班工时两不无。
A roster system will be formulated to ensure a regular and smooth flow of personnel to and from the project sites.
确定了产品设计工时定额的定义,提出了一种产品设计工时定额的制定方法及公式。
The definition and a simple formulation of product design time quota is established in the paper.
对民航座椅工时定额制定方法进行研究,建立了工时定额系统总体结构,并提出了其实现方法。
The structure frame of the man-hour quota calculation and its development for the civil aviation seats manufacturing are presented.
介绍了跨越段管道冬季施工方案的制定和实施过程,施工经验可供同类管道施工时参考。
In the article, the pro-gram of pipeline section removal and new pipe section installation construction in winter and construction process are introduced.
准确地计算中间产品加工工时定额是制定合理生产计划的基础。
A rational production plan is based on accurate estimation on manhour of interim product.
分析了异形工件在进行线切割加工时出现开裂变形的原因,并制定了详细的预防措施。
The factors of craze and transfiguration are analysed when the workpiece is cutting by wire-EDM machine, at the same time, the particular preventive measures are proposed.
本文针对近期生产的选矿厂大端盖,在粗车加工时发现的裂纹缺陷进行分析,查找原因,制定预防措施,保证了后期制作此类铸件的质量。
The paper presents reasons and preventing measures for crack of big blank cap happened in roughing tool, which can give some reference for such machine production in future.
利用MATLAB7.1对建立的网络进行训练和仿真,试验结果表明了BP神经网络计算工时定额的快速性、简便性及准确性,为企业制定工时定额提供了一种切实可行的方法。
Using MATLAB7.1 to train and simulate the network, The results show that the BP Network Computing time quota fast, simple and accurate, providing a viable solution to make time quota fo…
利用MATLAB7.1对建立的网络进行训练和仿真,试验结果表明了BP神经网络计算工时定额的快速性、简便性及准确性,为企业制定工时定额提供了一种切实可行的方法。
Using MATLAB7.1 to train and simulate the network, The results show that the BP Network Computing time quota fast, simple and accurate, providing a viable solution to make time quota fo…
应用推荐