• 刀盘设计断面岩石隧道掘进机(TBM)设计关键,影响其掘进性能决定性因素

    Being a crucial factor in influencing the performance of Full Face Rock Tunnel Boring Machine (TBM), the cutterhead design is one of the key issues of TBM.

    youdao

  • 他们凿出穿过坚固岩石隧道

    They drove a tunnel through the solid rock.

    《牛津词典》

  • 工程师须要在坚实岩石中开凿隧道

    The engineers had to tunnel through solid rock.

    《牛津词典》

  • 隧道是在坚固岩石中炸出来的。

    The tunnel was blasted out of solid rock.

    《牛津词典》

  • 打通山体的工人正在查看钻孔机器茜茜公主”打穿圣哥隧道最后一部分岩石

    Miners watch as the drill machine 'Sissi' breaks through the rock on the final section of the Gotthard Tunnel.

    youdao

  • 诸如蝎子蛇之类的典型沙漠生物青蛙水里动物岩石圆木挖掘隧道的水獭参展之列。

    Typical desert creatures such as scorpions and snakes are also on display, as well as animals that live in water like frogs, and otters that burrow under rocks and logs.

    youdao

  • 隧道困难部分57公里(35.4英里)的支线,它位于现在Gotthardbahn轨道下方2000英尺(600)以下岩石中。

    The most difficult portion of the tunnel is the 57 km (35.4 mi) stretch that will run nearly 2, 000 feet (600 meters) under the Gotthard massif below the existing Gotthardbahn track.

    youdao

  • 应力隧道衬砌相互作用问题岩石力学的一个十分复杂的问题,目前为止没有得到圆满的解决

    The interaction of stress wave with tunnel structures in rock mass is a complex problem, which up to now has not been solved completely.

    youdao

  • 然后,当隧道钻机还在强行向前钻进时,锂就过来消散隧道钻机表面帮助冷却玻璃化了的岩石

    It is then circulated back along the exterior of the tunneling machine to help cool the vitrified rock as the tunneling machine forces its way forward.

    youdao

  • 他们凿通穿过岩石隧道

    They drove a tunnel through the rock.

    youdao

  • 粗糙岩石印度熔岩隧道

    The rough, rocky floor of the Indian Tunnel lava tube.

    youdao

  • 切口隧道边界外面隧道壁是由钻机土地岩石的。

    The kerf is the outside boundary of the tunnel wall that a boring machine gouges out as it bores through the ground or rock.

    youdao

  • 本文关于岩石蠕变研究成果直接河悬索桥隧道锚固系统的安全分析提供了可靠依据

    The research productions in this paper directly provide reliable reference for safe degree evaluation of Siduhe suspension bridge tunnel-type-anchor-system.

    youdao

  • 隧道应力分析执行根据基本岩石最初重音测量

    Stress analysis of tunnels is performed based on initial stress measurements in the base rock.

    youdao

  • 根据数值模拟结果进一步确定象山港海底隧道底板线位置最小岩石覆盖厚度

    The location of soleplate line and the thickness the minimum rock cover are further studied through numerical simulation.

    youdao

  • 通过加权方法得到了确定海底隧道最小岩石覆盖厚度方法原则。

    The idea and method to determine the minimum rock cover depth of the subsea tunnel by the weight factors are also obtained.

    youdao

  • 考虑岩石聚力内摩擦变化进行一个二个隧道周围应力分布参数研究,内摩擦角?

    By considering the variations of the cohesion and the Angle of internal friction for rock, the parameter studies on the stress distribution around one and two tunnels were carried out.

    youdao

  • 隧道车站衔接但是大概50岩石分开

    The tunnels are connected at the station, but are about 50 meters apart in the rock.

    youdao

  • 深深大概同时挖洞和铁路隧道举办为了协调采矿活动造成相似岩石报告破裂

    Around the same time, deep and lengthy tunneling of road and rail tunnels was conducted in order to coordinate with mining activities, resulting in reports of similar rock bursts.

    youdao

  • 掏槽决定隧道爆破效率主要因素,掏槽腔内岩石碎块运动过程是掏槽爆破机理参数设计理论基础

    The cut is major factor to affect tunnel blast. The movement process of rock pieces in cut cavity is a theory base for cut blast mechanism and the parameter design.

    youdao

  • 隧道工程开挖深度逐渐增加趋势,深部岩石强度应力环境

    The Overburden of tunnel construction is increasing recently. Rocks in the depths have high strength and high stress condition.

    youdao

  • 通过X射线粉晶衍射成分分析,结合岩石荷载强度试验研究,查明国内外首次发现的此隧道部分砂质泥岩发生岩爆活动的内在原因

    Through the X-ray diffraction analysis and point loading strength test, intrinsic causes for the rockburst in some sandy mudstones in Erlang mountain highway tunnel has been ascertained.

    youdao

  • 地球物理勘探方法进行隧道掘进前方岩石结构超前预报,具有快捷准确实时处理及显示的优点

    The prediction of rock structure in front of face during tunneling using geophysical methods has the advantage of high speed and accuracy.

    youdao

  • 这项研究中,隧道附近岩石重音谈论根据岩石爆炸领域得到最初的重音测量并且根据AE监视安全控制解释

    In this study, the rock stress around the tunnel is discussed based on the initial stress measurements obtained in the rock burst field, and safety control based on AE monitoring is explained.

    youdao

  • 基于隧道涌水量解析公式,从隧道涌水量角度出发考虑确定海底隧道最小岩石覆盖厚度。

    Based on the analytic formula of groundwater inflow into tunnel, this paper puts forward a method to choose the minimal rock cover of sub-sea tunnel.

    youdao

  • 岩石隧道采用眼、药、爆破方法开挖

    Tunnels in rock are all dug by the method by drilling a small hole, packing explosive and dynamiting.

    youdao

  • 岩石隧道采用眼、药、爆破方法开挖

    Tunnels in rock are all dug by the method by drilling a small hole, packing explosive and dynamiting.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定