随着我们回头审视旅行的进度,我们可以绘制出如图2和3中所示的迭代(计划的和实际的)。
As we look back over the progress of the trip, we can chart the iterations (both planned and actual) as shown in Figures 2 and 3.
制定计划后,您需要一种方法来针对该计划监控进展,即检查实际进度的日期是否与计划一致。
Once a plan is developed, you need a way to monitor progress against the plan. That is, to check whether the actual progress to date corresponds with the plan.
有时柱状图也被称为甘特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。
Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.
您可以调查趋势,当您学习如何将您的计划的时程规划与实际相比较时应该能够改进您的项目计划和时间进度安排。
You can examine trends, and should be able to improve your project planning and scheduling as you learn how your projected timeframes compare to actuals.
按照批准的工程总进度计划,协调各专业进度计划实际运转,并督促进度计划的实施。
According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.
对于进度控制,可以将项目活动的实际进度和项目的计划进度进行比较,以监督项目的进度实施。
For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.
在对实际进度进行动态跟踪后发现实际进度与计划进度出现差异时如何进行有效而快速的调整,对监理工程师来说,这并不是一个容易的问题。
How to carry on valid and fast adjustment when difference appears between actual progress and former plan progress, to supervisory engineers, it is not an easy problem.
文章详细阐述了用挣值法进行费用、进度综合分析与控制,即对已完工作预算费用、计划工作预算费用和已完工作实际费用的分析与控制。
This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.
基于国内外有关研究成果和现阶段进度计划的实际编制方法,建立了一个动态进度计划的编制模型,并用计算机进行程序实现。
In this paper, a methodology is presented for making a dynamic progress schedule, and a macro program is written to automate this procedure.
并且列举了计划的实际成果。本文着重论述了电网建设项目进度计划的编制依据、方法、内容以及在实际管理中需要特别注意的问题。
It stresses the foundations, measures, contents of power grid project processing plan, while drawing construction plans, as well as the tips and major problems in management practice.
通过分析专业实际进度与专业计划进度的差距,结合实际找到适合本项目特点的进度控制方法。
By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.
当原定进度计划与实际进度或承包商的义务不相符时,承包商还应提交一份修订的进度计划。
The Contractor shall also submit a revised programme whenever the previous programme is inconsistent with actual progress or with the Contractor's obligations.
指出在考虑施工活动持续时间不确定的条件下,开展施工网络进度计划和优化研究,具有实际意义;
The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.
指出在考虑施工活动持续时间不确定的条件下,开展施工网络进度计划和优化研究,具有实际意义;
The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.