• 随着我们回头审视旅行进度,我们可以绘制出如图23中所示迭代(计划的和实际的)。

    As we look back over the progress of the trip, we can chart the iterations (both planned and actual) as shown in Figures 2 and 3.

    youdao

  • 制定计划后,需要一种方法针对计划监控进展,即检查实际进度日期是否计划一致

    Once a plan is developed, you need a way to monitor progress against the plan. That is, to check whether the actual progress to date corresponds with the plan.

    youdao

  • 有时称为特图,管理者用它准地知道任何一天工程进度,也能将实际进度计划进行比较

    Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.

    youdao

  • 可以调查趋势学习如何计划的时规划实际比较应该能够改进您的项目计划时间进度安排。

    You can examine trends, and should be able to improve your project planning and scheduling as you learn how your projected timeframes compare to actuals.

    youdao

  • 按照批准工程进度计划协调专业进度计划实际运转督促进度计划实施

    According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.

    youdao

  • 对于进度控制,可以项目活动实际进度项目的计划进度进行比较监督项目的进度实施。

    For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.

    youdao

  • 实际进度进行动态跟踪后发现实际进度计划进度出现差异如何进行有效快速调整监理工程师来说不是一个容易问题

    How to carry on valid and fast adjustment when difference appears between actual progress and former plan progress, to supervisory engineers, it is not an easy problem.

    youdao

  • 文章详细阐述了法进行费用进度综合分析控制,对已完工作预算费用、计划工作预算费用已完工作实际费用的分析与控制。

    This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.

    youdao

  • 基于国内外有关研究成果现阶段进度计划实际编制方法,建立了一个动态进度计划编制模型,并用计算机进行程序实现。

    In this paper, a methodology is presented for making a dynamic progress schedule, and a macro program is written to automate this procedure.

    youdao

  • 并且列举了计划实际成果。本文着重论述电网建设项目进度计划编制依据、方法内容以及实际管理需要特别注意的问题

    It stresses the foundations, measures, contents of power grid project processing plan, while drawing construction plans, as well as the tips and major problems in management practice.

    youdao

  • 通过分析专业实际进度专业计划进度差距结合实际找到适合项目特点进度控制方法

    By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.

    youdao

  • 原定进度计划实际进度承包商义务相符时,承包商提交份修订进度计划

    The Contractor shall also submit a revised programme whenever the previous programme is inconsistent with actual progress or with the Contractor's obligations.

    youdao

  • 指出考虑施工活动持续时间确定条件下,开展施工网络进度计划优化研究具有实际意义

    The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.

    youdao

  • 指出考虑施工活动持续时间确定条件下,开展施工网络进度计划优化研究具有实际意义

    The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定