该预算成本也要定期更新,以反映完工前的预测成本,并确保项目完工前的现金投入。
The budgeted cost should also be updated periodically to reflect the estimated cost to completion as well as to insure adequate cash flows for the completion of the project.
例如,图5.1中的a点表现在对应的完工百分比上其成本却有所超支,即在该点劳动量完成了40%,但成本支出却占到了预算成本的60%。
For example, point a in Figure 5.1 suggests a higher expenditure than is normal for the completion proportion. This point represents 40% of work completed with an expenditure of 60% of the budget.