所有的外墙安装箱式警报器都有三年的保证期。
All exterior wall mount tank alarms come completely assembled with a 3-year limited warranty. ETL Listed.
安装1。安装箱变应由专业安装公司负责起吊、安装;
Installation1 installation box change professional installation company should be lifting, installation;
所有的模式库可以链接到这个锚,所以,所有的已安装的模式都在相同的在线帮助集装箱(或工作薄)中被一起显示。
All pattern libraries can link to this anchor, so that all installed patterns are displayed together in the same online help container (or book).
这就是为什么他们用预装2,000多台服务器的集装箱,而这些服务器在数小时之内就可以安装并运行。
That is also why it USES shipping containers pre-loaded with up to 2,000 servers, which can be up and running within hours.
随后,被打造成画廊和更衣室的集装箱顶上还安装了顶棚。
A roof was then fitted across and the containers were transformed into viewing galleries and changing rooms.
这就是为什么他们用预装[font=Times New Roman]2,000[font=宋体]多台服务器的[font=宋体]集装箱[font=宋体],而这些服务器在数小时之内就可以安装并运行。
That is also why it uses shipping containers pre-loaded with up to 2, 000 servers, which can be up and running within hours.
集装箱支柱上要安装合适的绑扎装置。
Suitable lashing arrangement at container stanchions to be provided.
舱口盖和集装箱基座支撑上,安装110毫米高立式底座和110毫米高的吊眼板。
On hatch covers and on supports container foundations, 110 mm high and lashing eye plates 110 mm high will be provided.
舱顶要为集装箱基座安装衬板。
Pads will be arranged on the tank top for the container seatings.
美国有些州不允许在质量保证上附加“有限”条款。对于安装在美国、加拿大和波多黎各的美国百来福热水器,请参阅热水器包装箱内的完整的质量保证条款。
Some states of America do not allow limitations on warranties. For products installed in USa, Canada and Puerto Rico. See complete copy of the warranty included with the heater.
该公司表示,如果安装大型设备的努力失败,他们将在钻井破裂处安置一个小型集装箱。
It said it would try to place a small containment box over the rupture after efforts to install a larger device failed.
机组所有设备均可安装在集装箱内,便于出口和运输。
All the equipment is installed in the containerized frame for convenient export and transportation.
本发明包装箱结构紧凑,强度较高,其加工容易,安装方便快捷,可节省材料和仓储运输成本。
The packing box has compact structure, high intensity, easy processing, and rapid and convenient installation, and can save material and storage and transportation cost.
在农村,安装在集装箱内。
在厂家生产好的预制模块房运到场地后进行吊装,每个单体集装箱模块房大概需要半小时时间,集装箱模块房之间的对接处进行防水橡胶安装,最后进行楼梯和室内门的安装。
Each container needs about half an hour to be lifted. Then install waterproof rubber at the joint between containers. In the last, install the stairs and indoor doors.
公司共有集装箱拖车共计20台, 车辆均安装了全球卫星定位GPS系统,有效监控物流服务全过程,确保全程物流管理更安全、更规范、更高效地运作。
The company has 20 container trucks, which are all equipped with GPS for effective and through track and make safer, more standard and more efficient operation.
公司共有集装箱拖车共计20台, 车辆均安装了全球卫星定位GPS系统,有效监控物流服务全过程,确保全程物流管理更安全、更规范、更高效地运作。
The company has 20 container trucks, which are all equipped with GPS for effective and through track and make safer, more standard and more efficient operation.
应用推荐