伴随着伟大祖国成长、前进的步伐,大同煤矿集团走过了60年的历程。
Datong Coal Mine Group has gone through 60 years with the growth and stride of the great motherland.
阐述了大同齿轮集团采用三维CAD,在其主导产品重型汽车变速箱设计中的应用。
Elaborates the application of three-dimensional CAD in their main Products-heavy duty automobile gear box, in Datong gear Group.
介绍了大同煤矿集团公司计量工作面临的问题、计量保证体系的建立以及质量体系的认证。
The paper introduces existing problems of the metrological work, the establishment of metrological assurance system and the quality system certification in the Datong Coalmines Group Co.
会议原则通过了《大同煤矿集团公司兼并重组煤矿驻矿监管工作方案》、《2010年安全隐患排查、治理项目计划安排意见》等。
Meeting approved in principle "Datong coal mine Group merger and reorganization of coal in mine supervision," the "troubleshooting, 2010, security, governance project scheduling opinions".
介绍了大同煤矿集团近年来针对杂物问题所采取的措施和取得的效果。
The waste treatment countermeasures was adopted in the Datong Coal Industry Group and the gained result in recent year were introduced in this paper.
对大同煤矿集团公司开通重载列车引发的工务安全的一系列问题进行了分析,并提出了强化工务基础的措施和加强工务安全的对策。
Through analyzing a series of safe problems after using the heavy trains in the Datong Coal Mine Group co., the paper puts forward countermeasures strengthening the safe work.
通过对“热”作为商品和大同煤矿集团公司供热收费现状的分析,阐述了供热收费的重要性,提出了适合集团公司的收费计量方法。
This article analyses the present institution and the importance of the heating-charging happened at the Datong Goal Mining Corporation Ltd. The suitable measuring-methods are given.
前言:“两硬”条件下半煤岩巷掘进一直是影响大同煤矿集团有限责任公司采掘关系的主要问题。
Half coal rock lane quick-excavating technique under the condition of "two hard" has always been a main excavating problem influencing the Datong mining Cop.
本文对大同地区活性炭产业现状进行了深入分析 ,提出了大同建设集团化活性炭生产基地 ,增强国际竞争力 ,减少环境污染的对策。
The proposal to construct a group production base of active carbon in Datong is proposed to raise the competitivity and reduce pollution.
分析了大同煤矿集团公司和平街第二热交换站供热差的原因,提出了改进方案。
The paper analyses causes of poor heat supply of second heat exchange station in Heping Street and puts forward schemes of improvement.
分析了大同煤矿集团公司和平街第二热交换站供热差的原因,提出了改进方案。
The paper analyses causes of poor heat supply of second heat exchange station in Heping Street and puts forward schemes of improvement.
应用推荐