• 抽水蓄能电站具有调峰优良特性。

    Pumped-storage power plants can undertake the tasks of filling valley and modulating peak.

    youdao

  • 本文阐述水泥工业实现磨机重大意义;

    This paper describes the practical significance of removing peak and filling valley load on the grinder of cement mill.

    youdao

  • 实施电力需求管理可以提高终端用电效率,削填谷

    The practice of demand side management could increase the electric power efficiency of the customers and load shifting.

    youdao

  • 试验证明电解槽进行移峰技术改造具有可行性经济性

    The trial proves that the technology innovation of the electrolyzers is feasible and economical. 3.

    youdao

  • 因此蓄热电暖器可以实现电网用电负荷削峰填谷提高发电设备利用率;

    This kind of heater can shift electricity from peak periods to off peak periods, thus it can increase the using time of generators.

    youdao

  • 2001年开始浙江省逐步推行居民电价引导居民用户主动

    From the beginning of 2001, Zhejiang province has gradually promoted the peak and off-peak tariff, leading the resident customers to move the peak to fill the off-peak actively.

    youdao

  • 利用电力能源管理系统有效降低产品电能消耗实现降低生产成本

    The power energy management system can reduce the consumption of the products effectively in order to realize the peak load shifting and production cost reducing.

    youdao

  • 抽水蓄能电站电力系统进行调峰提高电力系统经济性可靠性有效手段

    Pumped storage plant is an effective measure to adjust peak, fill the valley and enhance efficiency and reliability for electrical power system.

    youdao

  • 静态效益即调峰产生的效益,进一步分为容量效益和电量效益(节效益);

    Static benefits are generated from peaking and valley-filling, which are further divided into capacity benefits and coal saving benefits.

    youdao

  • 电力需求管理可以提高终端用电效率削峰填谷减少推迟新机组建设提高用电服务质量

    Demand Side Management can be used to enhance electricity efficiency of the terminal, reduce or postpone investments for units and improve the quality of power services.

    youdao

  • 分时电价为了更好反映成本提供一种鼓励手段同时在荷时段节约电能

    The electrovalence at the period of time is to reflect costing better, and it can not only offers one way for peak shifting and valley filling but also save electric power at peak power time.

    youdao

  • 基于相变材料熔化凝固过程的相变潜热储能系统适用太阳能加热电力‘削峰填谷’、热能回收

    Latent heat storage system based on phase change materials' (PCMs) melting and freezing is particularly suitable for solar energy heating, peak-shift of electrical demand and heat recovery.

    youdao

  • 本文通过静态模拟给出抽水蓄能电站负荷曲线上削峰填谷初步情况并讨论了它几种运行模式。

    In this paper, a static simulation of the operation of pumped storage units is first given according to the load curre.

    youdao

  • 介绍一种基于趋势分析模糊理论控制技术电网最大需量控制领域应用,简述了控制工作原理、运行规则和系统组成。

    A control technology based on trend analysis and fuzzy theory was presented and its application in peak clipping, valley filling and maximum demand control area of the power network was introduced.

    youdao

  • 介绍一种基于趋势分析模糊理论控制技术电网最大需量控制领域应用,简述了控制工作原理、运行规则和系统组成。

    A control technology based on trend analysis and fuzzy theory was presented and its application in peak clipping, valley filling and maximum demand control area of the power network was introduced.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定