抽水蓄能电站具有填谷调峰的优良特性。
Pumped-storage power plants can undertake the tasks of filling valley and modulating peak.
本文阐述了水泥工业实现磨机移峰填谷的重大意义;
This paper describes the practical significance of removing peak and filling valley load on the grinder of cement mill.
实施电力需求侧管理可以提高终端用电效率,削峰填谷。
The practice of demand side management could increase the electric power efficiency of the customers and load shifting.
试验证明,对电解槽进行移峰填谷技术改造具有可行性和经济性。
The trial proves that the technology innovation of the electrolyzers is feasible and economical. 3.
因此该蓄热电暖器可以实现电网用电负荷削峰填谷,提高发电设备利用率;
This kind of heater can shift electricity from peak periods to off peak periods, thus it can increase the using time of generators.
从2001年开始,浙江省逐步推行居民峰谷电价,引导居民用户主动移峰填谷。
From the beginning of 2001, Zhejiang province has gradually promoted the peak and off-peak tariff, leading the resident customers to move the peak to fill the off-peak actively.
利用电力能源管理系统可有效降低产品电能消耗,实现移峰填谷,降低生产成本。
The power energy management system can reduce the consumption of the products effectively in order to realize the peak load shifting and production cost reducing.
抽水蓄能电站是对电力系统进行调峰填谷和提高电力系统经济性、可靠性的有效手段。
Pumped storage plant is an effective measure to adjust peak, fill the valley and enhance efficiency and reliability for electrical power system.
静态效益即调峰填谷所产生的效益,它进一步分为容量效益和电量效益(节煤效益);
Static benefits are generated from peaking and valley-filling, which are further divided into capacity benefits and coal saving benefits.
电力需求侧管理可以提高终端用电效率,削峰填谷以减少或推迟新机组建设并提高用电服务的质量。
Demand Side Management can be used to enhance electricity efficiency of the terminal, reduce or postpone investments for units and improve the quality of power services.
分时电价是为了更好的反映成本,并提供一种鼓励移峰填谷的手段,同时在峰荷时段还可节约电能。
The electrovalence at the period of time is to reflect costing better, and it can not only offers one way for peak shifting and valley filling but also save electric power at peak power time.
基于相变材料熔化和凝固过程的相变潜热储能系统适用于太阳能加热、电力的‘削峰填谷’、热能回收。
Latent heat storage system based on phase change materials' (PCMs) melting and freezing is particularly suitable for solar energy heating, peak-shift of electrical demand and heat recovery.
本文先通过静态模拟,给出抽水蓄能电站在负荷曲线上削峰填谷的初步情况并讨论了它的几种运行模式。
In this paper, a static simulation of the operation of pumped storage units is first given according to the load curre.
介绍了一种基于趋势分析和模糊理论的控制技术在电网削峰填谷、最大需量控制领域的应用,简述了其控制工作原理、运行规则和系统组成。
A control technology based on trend analysis and fuzzy theory was presented and its application in peak clipping, valley filling and maximum demand control area of the power network was introduced.
介绍了一种基于趋势分析和模糊理论的控制技术在电网削峰填谷、最大需量控制领域的应用,简述了其控制工作原理、运行规则和系统组成。
A control technology based on trend analysis and fuzzy theory was presented and its application in peak clipping, valley filling and maximum demand control area of the power network was introduced.