本文介绍了引子渡面板堆石坝填筑快速施工的经验。
The experience of quickly constructing face rockfill dam of Yinzidu hydropower station is introduced in this article.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouring dam construction in GongBoXia project.
第三章结合计算机图形学和计算机仿真技术,解决了堆石坝填筑施工过程二维、三维形象面貌生成的建模和实现问题;
In chapter 3, combining the computer simulation technology and the computer graphics, the planar and three dimensional animation showing the figure in different construction stages are achieved.
本文对面板堆石坝的施工分期、土石方平衡、料场选择和填筑工艺作了阐述,也对施工进度作了说明。
Construction stages and progress, equilibrium of earth-rock, selection of quarries as well as filling process is described in the paper.
小浪底工程堆石坝施工的主要特点是拦洪及度汛标准高、填筑方量大、工期短、填筑强度高。
The construction of Xiaolangdi rockfill dam is characterized by high standard of flood retaining and control, large quantity of dam filling, short construction period and high filling rate.
面板堆石坝观测系统对指导坝体填筑施工及水库蓄水后坝体的安全运行,具有极其重要的作用。
CFRD observation system plays important roles for guidance of embankment filling construction and safety operation of dam after reservoir filling.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.