• 土石施工中的土石方调配施工组织设计优选进行了讨论分析

    Two main problems in embankment dam construction, earthwork allocation and construction organization plan, are analyzed firstly in this paper.

    youdao

  • 改善重力稳定性提出齿型基岩面设计施工方法

    To improve the sliding stability of gravity DAMS, this paper proposes a kind of construction method by making a dentate joint between the dam and the base.

    youdao

  • 梁山隧道向斜存在高压隧道设计施工带来了很大难度

    There is high pressure and abundant water in MaoBa syncline where Yuanliangshan tunnel lies, that brings a great many difficulties for design and construction of the tunnel.

    youdao

  • 梁山隧道向斜存在高压隧道设计施工带来了很大难度

    There is high pressure and abundant water in MaoBa syncline where Yuanliangshan tunnel lies, that brings a great many difficulties for design and construction of the tunnel.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定