• 工程实行创优目标管理,全体施工人员牢固地树立质量第一”的意识,确保工程达到上海市合格工程

    The project is target oriented, all the staff should focus on "quality is the first" to make the project become the Shanghai qualified project.

    youdao

  • 工程实行创优目标管理全体施工人员牢固地树立起质量第一”的意识确保工程达到上海市合格工程

    The engineering practice merit goal management, the construction personnel firmly established "quality first" consciousness, To ensure the project reach Shanghai qualified projects.

    youdao

  • 培养合格教师科学家工程医生无疑国家优先事项

    Surely it is a national priority to train competent teachers, scientists, engineers and doctors.

    youdao

  • 依法应当进行消防设计建筑工程竣工时未经消防验收或者经验收合格擅自使用的;

    Those who make arbitrary use of a completed construction project which should conduct fire control design in accordance with law but has not passed or fail to pass the fire control acceptance check;

    youdao

  • 显而易见填补这些缺口来源自然那些合格的年长的工程人员当然机构发现公司已经逐步增加了对年龄超过50岁工程师的招募

    The obvious place to look to fill such gaps is among well-qualified older people, and indeed the institute found that companies had stepped up their recruitment of engineers over 50.

    youdao

  • 低成本增强制造过程、不合格工程变更管理无纸化报告;\ n ?

    Cost effectively enhance paperless reporting for manufacturing, nonconformances and Engineering Change management.

    youdao

  • 质量工程测试考察开发Dev活动是否合格

    Quality engineers test and qualify development (Dev) activities.

    youdao

  • 最后进行施工结构打点试桩经过地质监理工程技术人员检验合格后方可施工。

    Finally, the construction of the construction of the test pile, in the geological supervision of the engineering and technical personnel after the construction of qualified.

    youdao

  • 燃气工程设计是否符合规范施工质量是否合格直接影响到燃气设施正常运行

    Gas project design meets standards, and the construction quality is qualified directly affect the normal operation of gas facilities.

    youdao

  • 设计要求方面的不合格物项,工程人员评审

    Nonconformance to design requirements will require a review by Engineering department personnel.

    youdao

  • 施工单位应当工程竣工验收合格建设单位提供下列技术资料

    Following technical materials should, by contractor on the date of project completion acceptance, be provided to employer.

    youdao

  • 安居工程实现了100%竣工,100%合格,100%的销售率,100%的资金回收率

    Home Works achieved 100% completion rate, the passing rate of 100%, 100% sales rate of 100% funds rate.

    youdao

  • 申请485签证时候已经通过了合格技术评估那么我是否还需要通过适工程序(jrp)的评估?

    Will I be required to meet the JRP as I already hold a suitable skills assessment obtained when applying for my subclass 485 visa?

    youdao

  • 严格按照国家现行建筑安装工程施工验收规范》和业主质量标准施工,单位分项工程的质量评定合格达到100%。

    We will construct under the practicable state and quality requirement of client. The qualified percent of unit work up to 100%.

    youdao

  • 咱们商品出产结束工程洗车机厂最好进行查验彻底合格才能出厂为自个的招牌做衬托

    After the end of the production of our products, the best car washing machine factory inspection, after passing the factory completely qualified, this is a sign from the background.

    youdao

  • 任何一强迫对方使用合格建筑材料设备构配件于本工程的,都要签证记录在案,由此引起一切后果由强迫一方负责。

    Either party was forced to apply unqualified building materials, devices and component and fittings which shall be attested and placed on record. Aftermath shall be on the forcer's head.

    youdao

  • 西安工程大学服装表演专业合格成绩多少?。

    How many is that the Xi'an project learns qualified achievement of fashion show special field enthusiastically?

    youdao

  • 观感质量评定得分率,组成单位工程质量“合格”、“优良”等级的内容之一。

    Scores of sensory quality of a building is an essential parameter in the evaluation of a unit engineering quality.

    youdao

  • 根据SQA,QC工程技术人员共同完成供应商考察评估报告建立合格供应商清单

    Create approved vendor list for each part according to the supplier appraisal report finished by SQA, QC and Engineering.

    youdao

  • 实现高校德育目标培养国家合格建设人才需要,这是一个系统的复杂工程

    Realizing the goal of moral education in colleges and universities is the demand for cultivating the qualitified construction talents in China and is also a systematic and complicated project.

    youdao

  • 如何科学地混凝土实体强度进行合格评定我国工程质量评价理论中的一项空白

    How to carry out conformity assessment on strength of concrete solid scientifically is a blank in the theory of quality of the project Evaluation in China.

    youdao

  • 我们注意机械工程使用合格专家

    We are careful to use only the most qualified specialists in all mechanical engineering.

    youdao

  • 合格工程质量成了大坝隐患

    The poor quality of the construction became a hidden danger for the dam.

    youdao

  • 修复后建设工程竣工验收合格承包人请求支付工程价款不予支持

    If the restored construction project is inspected at the time of completion to be unqualified, and the contractor requests payment of construction costs, such request shall not be sustained.

    youdao

  • 工程硕士教育最终目标工矿企业培养合格工程

    The final goal of Master of Engineering education is to train qualified engineers for industrial and mining enterprises.

    youdao

  • 产品不良,出具不合格评审质量工程物流审批

    If the product is ng, have the nonconformity review report, send it to quality, engineer, logistic dept. Waiting for the review report.

    youdao

  • 产品不良,出具不合格评审质量工程物流审批

    If the product is ng, have the nonconformity review report, send it to quality, engineer, logistic dept. Waiting for the review report.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定