通过计算,分析了3号汽轮机轴向负推力产生的主要原因,介绍了堵平衡孔消除轴向负推力的方法。
This article analysis the major reasons that lead an axial negative thrust in unit 3, introduce the method of remove axial negative thrust with block the balance hole.
通过对2号汽轮机低压缸排汽通道进行优化改造试验,发挥了凝汽器铜管的热交换潜力,提高了凝汽器真空度。
The purpose is to increase the hot exchange potentiality of the steam condenser and improve the vacuum of the steam condenser.
福岛核电站2号反应堆汽轮机房地下室积水的放射性碘-134的水平急剧上升,达到正常标准的1千万倍。
The level of radioactive Iodine-134 in water in the basement of a turbine building adjoining the plant's Number-2 reactor spiked to more than 10 million times that of normal conditions.
广东罗定电厂1号机组DEH调速系统EH油压在一次冲转过程中,多次出现因为油压低,导致汽轮机跳闸。
The turbine was in trip in No. 1 power unit, Luoding power Plant, Guangdong because of low oil pressure in several times in the process of one stroke of EH oil pressure in DEH speed adjusting system.
漳泽发电厂4号机组汽轮机真空系统泄漏,降低了机组热效率。
The leakage in vacuum system of steam turbine for unit no. 4 in Zhangze Power Plant decreased thermal efficiency of said unit.
叙述了湛江发电厂3号机组a汽动给水泵汽轮机2号瓦振动问题的分析及处理的整个过程,指出造成2号瓦振动大的主要原因是不平衡及轴瓦刚性差。
This paper presents the vibration analysis and treatment of No. 2 bearing of the steam turbine for Unit 3 turbine driven feed water pump a in Zhanjiang Power Plant.
福岛核电站2号反应堆汽轮机房地下室积水的放射性碘- 134的水平急剧上升,达到正常标准的1千万倍。
The a level of radioactive Iodine-134 in water in the basement of a turbine building adjoining the plant's Number-2 reactor spiked to more than 10 million times that of normal conditions.
通过对某电厂5号机组及7号机组真空系统的严密性试验,分析汽轮机真空系统节能降耗潜力。
The tests of vacuum system tightness against power unit 5 unit 7 in a power plant have been described and energy reduction of the vacuum system of the turbine has been analyzed in this paper.
荆门热电厂采用数字电液调节系统(DEH)对5号机组原有液压调节系统进行改造,实现了汽轮机纯电调控制。
The pure electronic hydraulic control of No. 5 200 MW generating unit in Jingmen Cogeneration Power Plant is realized by retrofitting the original hydraulic governing system using DEH.
荆门热电厂采用数字电液调节系统(DEH)对5号机组原有液压调节系统进行改造,实现了汽轮机纯电调控制。
The pure electronic hydraulic control of No. 5 200 MW generating unit in Jingmen Cogeneration Power Plant is realized by retrofitting the original hydraulic governing system using DEH.
应用推荐