暂时不用的取压口应棒料丝堵密封保存。
仪表安装详图应根据上述注解反映取压口的方位。
Instrument installation detail drawings shall reflect taps in accordance with these notes.
系统的正确安装包括取压口的开口位置、连接导管的合理铺设和仪表安装位置的正确等。
Correct project items for system installing includes selecting pressure measure position, paving pipe reasonably and choosing proper install position.
变送器应直接安装在测量点,但强腐蚀性的或过热的介质不应与变送器接触,需借助引压管作为过渡,把取压口介质压力传输到变送器。
It should be installed on the measuring point but not to touch the medium with strong corrupt and high temperature. It is better to make a transition by a special pipe.
变送器应直接安装在测量点,但强腐蚀性的或过热的介质不应与变送器接触,需借助引压管作为过渡,把取压口介质压力传输到变送器。
It should be installed on the measuring point but not to touch the medium with strong corrupt and high temperature. It is better to make a transition by a special pipe.
应用推荐