• 暂时不用取压口丝堵密封保存

    Unused taps shall be plugged with bar stock plugs.

    youdao

  • 仪表安装详图根据上述注解反映取压的方位。

    Instrument installation detail drawings shall reflect taps in accordance with these notes.

    youdao

  • 系统正确安装包括的开位置、连接导管合理铺设仪表安装位置的正确等。

    Correct project items for system installing includes selecting pressure measure position, paving pipe reasonably and choosing proper install position.

    youdao

  • 变送器直接安装测量点腐蚀性的或过热介质变送器接触,需借助引作为过渡,取压口介质力传输变送器。

    It should be installed on the measuring point but not to touch the medium with strong corrupt and high temperature. It is better to make a transition by a special pipe.

    youdao

  • 变送器直接安装测量点腐蚀性的或过热介质变送器接触,需借助引作为过渡,取压口介质力传输变送器。

    It should be installed on the measuring point but not to touch the medium with strong corrupt and high temperature. It is better to make a transition by a special pipe.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定