告成煤矿卸载站煤仓自建成以来,仓壁内出现涌水,造成仓内煤体粘结而难以放出。
Since the unload station coal bunker is built in Gaocheng coal Mine, water is obvious in the coal bunker, it is difficult to cave coal which is glued in the coal bunker.
阐述了杜儿坪矿动力煤仓改造的必要性。给出了改造动力煤仓卸载站的技术方案和施工方案。
This paper expounds the necessity of steam coal bunker reformation in Duerping Mine, and gives the technical scheme and construction scheme of reformation of unloading chamber in steam coal bunker.
IM提供了一种高效机制来维护软件包,从而为安装、更新、修改和卸载操作提供了一个一站式服务。
IM provides an efficient mechanism to maintain software packages providing a one-stop shop for install, update, modify, and uninstall operations.
使用云计算环境来卸载主站的工作负载
结合之后,他们可以为浮式生产储存和卸载领域提供一站式服务。
Combined, they offer a single point for serving the Floating, Production, Storage and Offloading segment.
结合之后,他们可以为浮式生产储存和卸载(FPSO)领域提供一站式服务。
Combined, they offer a single point for serving the Floating, Production, Storage and Offloading (FPSO) segment.
如果原来曾经安装过通达信软件的,请先卸载,删除文件夹,并清空回收站!
If you have installed the original letter had access to the software, please uninstall and delete the folder and empty the Recycle Bin!
如果原来曾经安装过通达信软件的,请先卸载,删除文件夹,并清空回收站!
If you have installed the original letter had access to the software, please uninstall and delete the folder and empty the Recycle Bin!
应用推荐