操纵台采用的主要芯片是89c52。模拟试验台的主控制程序采用VC编制。
The main chip of the control box is 89c52. The main control program is made by VC.
能够运用各种方法进行制程参数的试验及确认,提升产品的品质与优化生产制程。
Carry out various methods to validate process parameter and promote product quality, and optimize production process.
制程电镀管控是否有热应力切片试验?
Are thermal stressed cross-sections performed as an in-process plating control?
校准设备和测试设备需按《检验、测量和试验设备控制程序》规定进行预防、搬运、储存。
The calibration and test equipment shall be preserved, handled and stored in accordance with the "Inspection, Measuring and test equipment Control Procedure".
发动机地面试车试验表明,该控制程序可满足发动机控制要求。
The test result indicates that the control program can meet the control requirements of the engine.
工程技术部负责按《检验、测量和试验设备控制程序》规定要求校准实验设备。
The Engineering & Technical Department is responsible to calibrate the test equipment according to the "Inspection, Measuring and Test Equipment Control Procedure".
对同种处理而言,本试验条件下施肥水平越高,对黄瓜生长的抑制程度越大。
Under the conditions of this experiment, in the same treatment type, the higher fertilization level was, the higher inhibition degree to cucumber was.
在本试验条件下,苏尼特母羊具有补偿生长的能力,且补偿生长的速率与受限制程度呈现正相关关系。
In the conditions of this study, Sunit ewes have the ability of compensatory growth(CG), and there was a positive proportion between compensatory growth rate and nutrition restricted degree.
外购件、外协件检验申请单〉,报质量部检验,执行《检验和试验控制程序》。
Out-sourced Parts Inspection Application Form and submits it to the Quality Department for inspection. Implement the "Inspection & Test Control Procedures".
试件经测试不合格则由实验室出具试验报告交送验部门,由送验部门按《不合格品控制程序》处置。
The lab will issue a test report to the delivery department if the test part fails the test. The delivery department will dispose per the "Nonconforming Product Control Procedures".
试验报告按《质量记录控制程序》规定保存期保存。
The test report will be retained for a length of time as required in "Quality Record Control Procedure".
氦净化系统的关键设备、管路设计和计算机控制程序等通过系统调试得到了验证,试验表明设计是成功的。
The key equipments, the design of pipes and codes have been verified by the performance test. The test shows that the design is successful.
氦净化系统的关键设备、管路设计和计算机控制程序等通过系统调试得到了验证,试验表明设计是成功的。
The key equipments, the design of pipes and codes have been verified by the performance test. The test shows that the design is successful.
应用推荐