提出更准确地描述准时化生产计划问题的非线性半无限规划模型。
To closely describe the just - in - time production planning problems a nonlinear semi - infinite programming model is proposed.
什么是准时化生产?什么是丰田生产体系?回顾构成TPS的每个元素。
What is Just-in-Time? What is the Toyota Production System? Review each element making up TPS.
第三部分相关理论综述。阐述了准时化生产方式、质量管理体系和5s现场管理方法的理论。
New management methods This part describes the definition and theory of JIT, Quality Control System's establishment, 5s workshop management methods.
针对汽车再制造工程中的实际问题,对利用JIT技术来实现汽车再制造的准时化生产进行了进一步的研究。
Aim at actual problem within the automobile remanufacture engineering to make use of the technique of JIT research on producing to the automobile remanufacture on time.
主要体系的实施正是在这一阶段,比如背离了价值流图的改善蓝图,比如准时化生产和全员生产力维护的实施。
The major systems possible to implement in this phase as depart from the Value Stream Mapping Kaizen Blue Print, such as implementation of JIT and TPM.
本文概要地介绍了准时化(JIT)生产方式的产生、特点,以及准时化生产方式与传统的大批量生产方式的比较。
This article introduces the origin and characteristic of Just in Time (JIT) production system and the comparison between JIT production and Mass production.
论文对目前存在的问题进行了详细的分析,结合企业资源计划及准时化生产的管理思想,提出了一种新型的钢铁企业生产管理模式。
This thesis combines the management idea of enterprise resource planning and just in time production, brings forward a new production management mode of steal enterprise.
那企业如何在生产过程中实现零库存,在产品质量监管上实现零不良,在生产成本上实现零浪费,从而最终实现拉动式准时化生产方式呢?
How can you achieve zero inventories in the production process, achieve zero non-performing in product quality control and zero waste in the cost of production?
物料需求计划系统的目的是准时生产,减少库存,以实现单个企业内部的最优化生产。
MRP system is aimed at the production time and reduce inventory in order to achieve a single enterprise to optimize production.
物料需求计划系统的目的是准时生产,减少库存,以实现单个企业内部的最优化生产。
MRP system is aimed at the production time and reduce inventory in order to achieve a single enterprise to optimize production.
应用推荐