提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
最简单的处理测试用例优先权的方法是关键路径的识别。
The simplest approach to test case prioritization is identification of critical path.
本文在介绍了家电产品回收再利用的实际意义、关键技术后,介绍了解决目前产品回收过程中工艺路径方案优化问题的研究方法。
This paper introduces the real meaning and key techniques of recycling and reusing of products, as well as the method of solving the problem of optimization of recycling processes of products.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
为了动态验证工作流中活动实例的截止期限,提出了一种基于关键路径进行动态验证的方法。
To verify deadlines of activity instances within workflow, a method of dynamic verification was proposed based on the critical path.
在介绍传统的调度方法的基础上,引进了关键路径法在自动生产调度上的运用,并介绍了关键路径法中的网络优化方法。
The paper introduces the traditional scheduling method, discusses the application of CPM on automatic production scheduling and introduces the network optimization method in CPM.
电路综合实验表明采用本文所提出思想和方法可以有效减少MAC关键路径时延和电路门数。
Through the synthesis of MAC circuit, it validates that the ideas and methods presented in the paper do well to reduce the critical path delay and circuit gates.
当工程网络计划中活动持续时间为已知的确定值时,关键路径法被证明为是一个网络计划的有效方法。
When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.
路径测试是软件测试中一种重要方法,而测试的关键是确定路径数目和设计测试用例。
Path testing is an important method in software testing, the key of path testing is to determine the path Numbers and to design test case.
文章在静态时序分析的基础上,提出了一种利用关键路径时延信息提高FPGA分割效率的方法。
In this paper, on the basis of static timing analysis, a new method is employed to enhance the efficiency of FPGA partition by extracting the information of critical path-delay.
其次,提出从导航路径中利用构造复合后缀树的方法来挖掘用户关键路径,并利用关键路径将用户聚类成不同的兴趣群。
Second, general suffix tree algorithm is used to mine the key path from user's all navigation paths, and using key path to cluster all users into different interest groups.
本文提出了一种带关键路径的挣值法评价方法,在比较分析BCWP与BCWS的同时对关键路径上的BCWP与BCWS作比较,以便更准确地把握项目进度情况。
It's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time.
本文通过对项目管理知识体系和项目时间管理理论的阐述,详细介绍了时间管理中关键路径的理论和使用方法。
By elaborating the knowledge hierarchy of Project Management, and time Management theory, the article explains Critical Path method of managing time, and how to apply the method.
并对关键链项目管理方法与传统的项目管理方法,如关键路径法、计划评审技术的优势和劣势进行了比较。
Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.
针对自由运动,提出了一个基于路径关键点提取的动作级任务建模方法;
An action-level task modeling method for free move is proposed, which is based on a method of key point extraction from the trajectory.
文章介绍了确定关键路径的方法,通过确定关键路径以确定工程的工期并找出关键活动以缩短工期。
The article introduces the method of the critica1 path, confirms the limited time of a project through confirming the critical path and finds out critical activity of the project to shorten time.
提出基于关键路径的测试方法,利用较少的测试用例覆盖较多的软件执行过程。
The testing based on critical routes can cover more software execution routes with fewer test cases.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.