• 在流水段中让有主楼结构地下室施工上部结构的地下室施工作为施工场地

    Engineers firstly construct basement under main building, then basement with no upper structure as construction field.

    youdao

  • 路基分段作业施工路段必须不陡1:5的面,坡必须整平压实,以便施工机械上下段路基施工时开台阶。

    When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.

    youdao

  • 施工清理现场检查施工部位有没有工种预埋件,是否影响板块的铺砌或铺

    Before the construction, it is necessary to clean the spot and check if there is Pre -embedded part of water heating electric and so on, if there is effect to lay and stick of the floor tile.

    youdao

  • 产品既可以直接使用可以溶解溶液外加剂使用,适用各种施工环境搅拌机型要求

    The product can directly use, also can first soluble in water, match into solution type admixtures use, it is applicable for various construction environment or mixing machine requirements.

    youdao

  • 施工人员必须拆除内部线路切断预计需要23

    Construction personnel must first be removed, internal lines cut, then block the demolition, is expected to take 2 to 3 days.

    youdao

  • 本文工艺原理特点、工艺技术几个方面,论述预应力混凝土空心板梁施工技术

    The paper discussed the construction technology of pre tensioned prestressed concrete hollow plate beam from the technologic principle, characteristic and construction technique.

    youdao

  • 针对简支后连续的组合箱梁设计施工经常出现的质量通病,提出相应的防治措施建议具有一定的现实意义

    It has realistic significance to present some prevention measures and advice aiming at common quality problems lie in simple supported steel-concrete composite box girder design and construction.

    youdao

  • 临时支座拆除支后连续结构体系施工过程中的关键工序之一

    The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.

    youdao

  • 目前光面爆破设计施工均未考虑爆造成光爆层岩石损伤光面爆破参数影响

    At present, in the design and construction of smooth blasting, considering few influence that main blast hole 'first blast damage to rock of smooth blasting parameters.

    youdao

  • 方家大桥采用简支后连续施工方法,通过逐次接长连续梁、逐次拆除临时支座来实现结构体系转换

    The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.

    youdao

  • 混凝土转换采用叠合梁施工方法,由于混凝土对浇混凝土约束,使叠合面产生剪应力。

    The concrete transfer beam applies laminated beam in construction, and because of the constraint of earlier pouring concrete to later pouring concrete, shear stress is induced in lamination.

    youdao

  • 根据施工实践,简要地介绍张法式张拉台座中的传力设计思路

    Combined with the construction practice, the paper introduced the design idea of concrete bar dowel for pretensioned grooved stretching bed etc.

    youdao

  • 施工条件板块地面施工一般是顶棚、立面完成之后进行铺设地面,安装踢脚板

    Construction Standard the construction of floor board usually after the ceiling and the decoration of retaining wall, first lay the floor, then install the washboard.

    youdao

  • 本文介绍了预应力简支后连续梁桥施工方法施工工艺质量保证措施施工过程中的注意要点以及体系转换问题。

    This paper also introduced the construction method, construction technic, quality control measure and the construction key of the structure system change of the simple-continuous beam bridge.

    youdao

  • 地铁施工一般采取竖井继而通道后开马头门进行正线施工施工工序

    The general procedures for constructing subway are as follows: first excavate the shaft, then horizontal pass, finally ingate.

    youdao

  • 项目施工期间协调部门所有活动对供应商施工进行计划,安全质量时间管理

    Coordinate the relative department activities during the projects period and manage the contract activities for schedule, safety, quality and deadline.

    youdao

  • 张法预应力空心板梁冬季施工过程中,产生裂缝

    It is easy to bring crack that pretensioned prestressed hollow slab beam is constructed in winter.

    youdao

  • 介绍预应力施工工艺,并根据实际施工经验,预应力损失进行了分析,具有一定的参考价值。

    The paper introduced the construction technology of prestress pretensioning method, analyzed prestress loss by construction experience for reference.

    youdao

  • 张法预应力混凝土空心板梁施工过程作了详细的介绍,对施工存在问题作了相应的改进措施。

    The paper introduces specific construction process of pretensioning cored slab beam at some length, improves existing problems in construction.

    youdao

  • 介绍围堰成桩后下钢围堰两种施工方法及其优缺点。

    Two construction methods including first sinking steel cofferdam then forming pile and first forming pile then sinking steel cofferdam, together with their advantages and disadvantages are introduced.

    youdao

  • 他们多次开发商建议停止4后面施工护坡开发社区业主一个安全居住环境

    They for many times to tapping company suggest and stop 4 constructions of backs and set up good slope protection first, then to develop community, give the owners a living condition of safety.

    youdao

  • 结合太原市向阳店桥梁施工实例介绍了采用张法进行预应力桥梁板施工过程

    Combined with construction example the construction process of prestressed bridge plate adopting pretensioned system is introduced. The construction technology of bridge plate is elaborated.

    youdao

  • 连续桥梁现在桥梁施工采用形式

    The continuous bridge after simply supported is the building type adopted in current bridge construction.

    youdao

  • 停车库设计施工过程中,非常重要的细节安全通常放一放。

    During the design and construction of a parking garage, one of the most important details that are often put on the back burner is security.

    youdao

  • 架的安装过程中,采用地面段组拼、临时支架拼装拱,然后大型浮吊每两榀钢拱架吊装就位、利用地形用万能杆件支架代替缆风临时固定施工技术是成功的。

    When the arch bridge was erected, arch sections were first assembled on the ground, the arch sections were then put together into an arch with the help of temporary supports, and the steel arches w...

    youdao

  • 临时支座拆除简支后连续结构体系施工过程中的关键工序之一。

    The structure system transformation has been implemented by successive extending beam and demolishing temporary support.

    youdao

  • 临时支座拆除简支后连续结构体系施工过程中的关键工序之一。

    The structure system transformation has been implemented by successive extending beam and demolishing temporary support.

    youdao