停炉之后的蒸汽锅炉保养方法有哪些?
The furnace after steam boiler maintenance methods are there?
一旦发生裂纹,漏气漏水,必须停炉维修。
It needs to be repaired while cracking, which will lead to air leak and water leak.
若故障加剧,直接威胁人身或设备安全时,则应停炉。
If the fault is deepening, direct threat to the personal or safety equipment, should be stopped.
锅炉停炉后的维护颐养,分为炉体外部和锅内的防腐颐养。
The boiler boiler stop after maintenance, care is divided into furnace external anti-corrosion and pot die.
如机组需要停炉处理,则吹扫完成后,停运送、引风机进行闷炉。
If the unit needs to stop the incinerator, then after blowing, outage send, induced draft fan for stuffy furnace.
锅内的防腐颐养,依据停炉时间的长短选择干法颐养和湿法颐养两种。
The pot of corrosion remaining, according to the length of the furnace choose dry and wet the two care care.
普通状况下,停炉不超越一个月的可用湿法颐养,一个月以上的应采取干法颐养。
General situation, are no more than a month of the furnace can be used wet, care should be taken more than a month of dry remaining.
今天下午听到的消息,贵方已同意停炉消缺,我们很高兴,这是对机组安全运行负责的务实态度。
We are very pleased to hear your agreement on furnace shutdown for defect elimination this afternoon, which well displays your responsible and pragmatic attitude to the unit safe operation.
该控制系统能实现造气工段的自动运行、手动操作、阀位自动检测、自动报警和紧急停炉等功能。
The control system serves many functions of auto-operation, manual operation, auto-test valves, autoalarm and emergency stop.
如锅炉房位置低洼,停炉期间空中泛潮严重时,则应采用经常小火烘烤和放置枯燥剂相分离的方法。
Low-lying such as boiler room position, the furnace during flood tide serious hanging in the sky, is often small baking should be adopted the way of separating and placed dry agent.
介绍了25MVA硅铁电炉长时间停炉后的开炉操作实践,着重论述了采用旧电极直接开炉操作的新工艺。
The practice for 25MVA FeSi electric furnace blow in after long blowout was introduced. The new process of direct blow in with old electrodes was expounded in particular.
启动风机将空气鼓入加热炉炉膛,使停炉时可能残存炉膛内的煤气吹净,风机吹扫5分钟后方可送气点火。
Start up fan will air into the furnace chamber, make drum boiler stop when the gas chamber may remaining purging and fan blowing off five minutes before commencement of ignition.
沙角发电总厂A厂5号炉a空气预热器(以下简称“空预器”)在停炉期间发生二次燃烧,造成该空预器严重损坏。
Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.
宣钢8号高炉第一代大修时,在停炉前对炉底侵蚀深度进行了计算,并确定了残铁口的位置,使停炉后放残铁取得了成功。
The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.
宣钢8号高炉第一代大修时,在停炉前对炉底侵蚀深度进行了计算,并确定了残铁口的位置,使停炉后放残铁取得了成功。
The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.
应用推荐