管架集团工程总监(PSG)将对照供应商的建议要求,对经认可的设计报告进行评审,并提出相关行动意见。
The PSG Engineering Director will review the approved design report against the proposed deviation and advise on a course of action as appropriate.
评审人员,将供应商提出的建议要求记录在经认可的设计报告中,并将详情提交给管架集团工程总监(PSG)评审和验收。
The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.
应编制来料检验报告(RIR附件0702-3),证明已经执行来料检验,供应商文件已经过评审。
The receiving inspection Report (RIR Exhibit 0702-3) shall be prepared for documenting that the receiving inspection has been performed and vendor's documentation has been reviewed.
根据采购需要,制定供应商评审计划,并组织按期评审,完成报告。
Drew out audit plan to the supplier according to purchasing requirement, and organize the audit as schedule, then finish the audit report...
根据采购需要,制定供应商评审计划,并组织按期评审,完成报告。
Drew out audit plan to the supplier according to purchasing requirement, and organize the audit as schedule, then finish the audit report...