在使用这种模式时,首先将一个较大的任务分解为许多较小的任务,后者将在一组资源中并发地运行。
With this pattern, a large task is first decomposed into many small tasks which then run concurrently across a collection of resources.
Power ha会创建一个资源组以保护指定的应用程序并执行以下任务。
PowerHA will create a resource group to protect specified application and will perform the following tasks.
资源内核提供了一组应用程序编程接口(API),允许任务请求这些预留资源(见图5)。
The resource kernel provides a set of application program interfaces (APIs) to allow tasks to request these reservations (see Figure 5).
如果没有正确分配任务,则可能会造成一组资源工作负荷太重,另一组却无事可做。
If they are not properly allocated to their tasks, it could be that one group of resources are overworked, while another group is waiting for work.
此任务的信息已经修改。应该发送一个工作组更新信息来更新资源。
Information for this task has changed. A TeamUpdate message should be sent to update the resources.
讨论了项目进度计划中与冲突资源相关的关键任务、关键任务组以及关键任务群,提出了统一的定量表示方法。
This paper discussed the critical task, critical task set and critical task group involved conflict resource in a project scheduling scheme, and put forward a unified quantitative express method.
目前研究的动态任务调度算法都基于集中式或部分分布式网格系统,系统中心节点(组)进行资源管理。
A dynamic scheduling algorithms studied in references are based on centralized grid system or part-distributed grid system, in which there are center node (s) to manage resources.
教师组工作能力与职业任务、紧张反应均呈负相关,而与应对资源呈正相关(P<0 .0 1)。
The correlations of work ability, occupational stress and strain, and personal resources were significant in teachers (P<0.01).
结果医师组职业任务和应对资源得分高于对照组,有非常显著差异(P< 0 .0 1)。
Results The scores of ORQ and PRQ in doctor group were significantly higher than that of control group (P<0.01).
结果医师组职业任务和应对资源得分高于对照组,有非常显著差异(P< 0 .0 1)。
Results The scores of ORQ and PRQ in doctor group were significantly higher than that of control group (P<0.01).
应用推荐